Nortek P5RF-A Скачать руководство пользователя страница 18

18

Содержание P5RF-A

Страница 1: ...se plays an important role as well Pay attention to all safety warnings and any other special notes highlighted in the manual Improper installation of the furnace or failure to follow safety warnings...

Страница 2: ...Stage Heating 8 Cooling Mode 9 Electric Heat Package optional 9 Blower Speed 9 Outdoor Motor 4 5 Ton 9 Startup Adjustments 10 Pre Start Checklist 10 Start Up Procedure 10 Air Circulation 10 System Coo...

Страница 3: ...ant will damage the unit WARNING The information listed below must be followed during the installation service and operation of this unit Unqualified individuals should not attempt to interpret these...

Страница 4: ...ld be avoided The hot condenser air must be discharged up and away from the home and if possible in a direction with the prevailing wind Do not place the unit in a confined space Consideration should...

Страница 5: ...y be necessary to loosen the four screws that hold the transition duct in order to install the supply fitting Re tighten when installation is complete 4 Tap collar if necessary to ensure engagement wi...

Страница 6: ...rical conductors and circuit protection must be in compliance with information listed on the unit data label Any other wiring methods must be acceptable to authority having jurisdiction Provide power...

Страница 7: ...an uninterrupted or unbrokenelectricalgroundtominimizepersonal injury if an electrical fault should occur Do not use gas piping as an electrical ground Thisunitmustbeelectricallygroundedinaccordancew...

Страница 8: ...e use of a 2 stage Heat Cool thermostat should be used with this unit The heat cool thermostat prevents simultaneous operationoftheheatingandcoolingunitsandisequipped withanON AUTOfanmodethatallowsthe...

Страница 9: ...ntrols high speed cooling and heating operations and the orange wire controls the electric heating operation CAUTION To avoid personal injury or property damage make certain that the motor leads canno...

Страница 10: ...teps 1 3 until the system is correctly charged START UP ADJUSTMENTS Pre Start Checklist The following check list should be observed prior to starting the unit Verify the unit is level and allows prope...

Страница 11: ...on this equipment requires certain mechanical skills and tools If you do not possess these skills contact your dealer for maintenance Consult your localdealerabouttheavailabilityofmaintenancecontracts...

Страница 12: ...PT Drain Connection 1 12 13 1 38 3 2 3 2 5 29 A 3 Opening for 12 Diameter Supply Duct 9 15 17 50 9 0 Opening for 14 Diameter Return Duct 10 15 5 5 B 1 3 15 Rear View Side View Figure 7 Unit Dimensions...

Страница 13: ...uid Temperature F X24KA Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 9 Charging Chart for 3 ton Units 200 220 240 260 280 300 320 340 360 380 400...

Страница 14: ...g Liquid Temperature F X48KA Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 11 Charging Chart for 5 ton Units 200 220 240 260 280 300 320 340 360 38...

Страница 15: ...onducteurs en cuivre 3 Ne convient pas aux installations de plus de 150 V a la terre 7112720 FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE WIRING DIAGRAM Packaged Air Conditioner Single Phase NOTES 1 D...

Страница 16: ...e 150 V a la terre FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE WIRING DIAGRAM Packaged Air Conditioner Single Phase NOTES 1 Disconnect all power before servicing 2 For supply connections use copper c...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...________________ VOLTS L1 L2 Volts ______________________________________ VOLTS Hasthethermostatbeencalibrated YES NO Is the thermostat level YES NO Istheheatanticipatorsettingcorrect If Applicable YE...

Отзывы: