2
MM271 Installation Instructions
MM271 Installation Instructions
3
1
3
5
11
1
6
2
Q
K
U
7
3
6
8
9
10
M
L
T
6
11
V
OPEN gate and reattach operator with clevis pin. Check to
ensure the operator is level.
Secure post pivot bracket to post bracket with the hardware
provided (Q,K,U) when you have achieved the 1” clearance
shown in Step 5 in both open and closed positions.
Mark middle of post bracket slots on fence post. Mark middle
of gate bracket slots on gate cross support.
Remove clamps, post bracket, gate bracket, and operator. Then
use a hammer and center punch to mark
hole positions.
Drill holes completely through gate post and gate cross support.
Attach post bracket assembly to gate post.
NOTE:
Must be
through bolted.
GATE OPERATOR INSTALLATION
1
2
3
5
6
12
T
L
L
V
P
2
1
1
13
2
14
15
4
H
1
5
1
2
2
1
Attach and secure operator assembly to brackets.
Attach gate bracket assembly to gate cross support.
Check for level. Adjust post bracket if necessary.
Tighten all bolts and remove excess length on post and gate
bracket bolts with hacksaw.
Remove the arm from the front bracket then attach closed position stop
plate to the leading edge of the gate with one of the following:
•
U-bolts
—tube and chain link gates (Not included)
•
Wood/lag screws
—flat aluminum/wood supports (Not included).
Position gate stop with gate CLOSED to fence post. Tighten
fasteners. Cut off excess bolt length.
GATE OPERATOR INSTALLATION
CLOSED POSITION STOP PLATE INSTALLATION