background image

Doc No. 700016  Page 16 of 16 

 

3.  User & Operating Instructions. 

3.1 

To Start the Heater 

 

1. Ensure gas supply is turned on. 
 
2. Electrical supply to the controls is on. 
 
3. Ensure that the controls are correctly set 

i.e.; 

 

• 

Clock is correctly set. 

• 

Heater program is correctly set. 

• 

Required room temp is correctly set 

 
4. Once the heating controller ‘calls for heat’ 

power will be supplied to the heater(s). The 
red neon will then illuminate. 

 
5. After a pre-purge period of 10 seconds the 

burner will ignite and the amber neon will 
then illuminate. 

 
6. If lockout occurs press the lockout reset 

button (if available), or switch off electrical 
supply and restart after 15 seconds. 

 
7. If lockout occurs three times consecutively 

switch  off  and  isolate  the  gas  and         
electricity supplies. 
Contact the 

Nortek Global HVAC (UK) Ltd 

Service department.

 

 

 
 
3.2.  To Switch Off Heater 
 

1. Switch off electrical supply to the heater. 

The burner will stop and the fan will shut 
off. 
 

2. If the heater is to be switched off for      

periods in excess of one week it is highly    
recommended that both the gas and the 
electrical supplies are turned off. 
 
 
 

3.3.  Routine Maintenance between Service 

Intervals 

 

After ensuring that the heater is cold and 
mains electric isolated, cleaning of the 

 

 

 

 

 

 

 

reflectors  with  a  soft  cloth  and  a  mild          
detergent (non solvent based cleaners only) 
in water can be undertaken. 

 

Additional removal of dust from the radiant 
tubes, burner and heat exchanger can be   
undertaken. 

 
 
 

3.4   Frequency of Servicing 
 

The manufacturer recommends that to 

 

 

ensure 

continued 

efficient 

and 

safe         

operation 

of 

the 

appliance 

it 

is                 

recommended that the heater is serviced 
annually by a competent person e.g. every 
year in normal working conditions but in 
exceptional dusty or polluted conditions 
more frequent servicing may be required. 

 

The manufacturer offers a maintenance 

 

 

 

 

service. 

 

Details are available on request. 

 

For Service requirements, please contact   

Nortek Global HVAC (UK) Ltd.

 

 

For further technical and service support 
visit our Support Information Database at     
www.s-i-d.co.uk 

Document refe

re

nce number 

GB/

VS/190

A

/0815

 

Replaces GB/VS/190A/0112

 

Nortek Global HVAC is a registered trademark of Nortek Global HVAC Limited. Because of continuous product innovation, Nortek Global HVAC reserves the right to change product specification without due notice. 

 

NORTEK GLOBAL HVAC (UK) LTD 

Fens Pool Avenue 

Brierley Hill 

West Midlands  DY5 1QA 

United Kingdom 

 

Tel: 

01384 489 250

 

Fax: 

01384 489 707

 

 

[email protected] 

www.ambirad.co.uk 

Registered in England No. 1390934. Registered office: 10 Norwich Street, London, EC4A 1BD 

Содержание Ambirad Vision VSX

Страница 1: ...s Act 1974 or relevant codes of practice In addition the installation must be carried out in accordance with the current IEE wiring regulations BS 7671 BS 6896 Industrial Commercial and any other rele...

Страница 2: ...canopy and end caps in Aluzink 1 1 Health and Safety Nortek gas fired heaters must be installed in accordance with the relevant provisions of the Gas Safety Installations and Use Regulations 1998 Due...

Страница 3: ...o complete the tasks laid out in this manual Pozidrive Screwdriver Trestles Leather Faced Gloves Tape Measure Spanner Set 4 5mm Allen keys 2 2 4 Reflectors All reflectors AND canopies must be position...

Страница 4: ...6x 2 3 Identification check list 2x 1x 1x 1x 4x 4x 5x 2x 2x 4x 3x 4x 10x M8 Full Nut 16x 22x 28x No 5 Torque Screw 13x 14x 15x Turbulators 2 2 6 Burner and Heat Exchanger Assembly Slide the burner ass...

Страница 5: ...5 VSX4M 45 50 M4 Full Nut 1x 2x M6 Washer M6 Full Nut M6 x 35 Setpin M4 Washer M6 x 15 Setpin 6x 10x 6x 4x 6x 4x 7x 2x 8x 4x 8x 14x 8x 3x 9x 6x 2 4 Prior to assembly Ensure the area in which you are w...

Страница 6: ...for location length 3 CAUTION SHARP EDGES 2x 3x 3x 5x Working at the opposite ends of the tubes to the burner locate position two couplers so that the socket heads are facing outwards the pre fitted...

Страница 7: ...nd bracket 2 5 3 Reflectors 2x 3x 7 CAUTION SHARP EDGES Slide end reflector so that the innermost slotted holes line up with 1st bracket fixing holes then fix in place using M6 x 35mm pins washers nut...

Страница 8: ...g outwards 3x 3x 3x 3x 1x 2x 1x 2x 12 13 3x 3x 3x 3x 2x 2x 11 3x 3x 3x 3x 3x 2x 3x 3x 2 5 5 Canopies Remove protective film before starting Slide the outer canopies over the reflectors from the U bend...

Страница 9: ...ofile at the U bend end fix with screws Repeat procedure for cut out canopy end cap again ensuring the flange faces inwards 2 5 6 Canopy End Caps 16 2x 2x 12x 12x CAUTION SHARP EDGES 17 1x 1x 1x 1x 2...

Страница 10: ...700016 Page 10 of 16 Figure 1 VSX2M 20 25 30 2600mm 20kW ONLY 3400mm 25 30KW TURBULATORS 976mm TURBULATOR COUPLER 1365mm 1650mm 50 mm O LAP 50mm O LAP 38mm 150 4047mm REFERENCE 3400mm TUBE Y Z X Z Z...

Страница 11: ...of 16 Figure 2 VSX3M 30 35 40 45 5927mm REFERENCE 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP COUPLER 138mm 5200mm TUBE 1365mm 976mm TURBULATOR 2600mm TURBULATOR 150 2600mm TURBULATOR 1880mm 1650mm Y...

Страница 12: ...90mm REFERENCE 50mm O LAP COUPLER 976mm TURBULATOR 1200mm 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP 50mm O LAP 293mm 1880mm 1880mm 1650mm 150 COUPLER 3400mm TURBULATOR 3400mm TURBULATOR 50kW ONLY 52...

Страница 13: ...Doc No 700016 Page 13 of 16 Figure 4 VSX Heater Breakdown 3 module shown...

Страница 14: ...Doc No 700016 Page 14 of 16 Notes...

Страница 15: ...Doc No 700016 Page 15 of 16 Notes...

Страница 16: ...cold and mains electric isolated cleaning of the reflectors with a soft cloth and a mild detergent non solvent based cleaners only in water can be undertaken Additional removal of dust from the radia...

Отзывы: