43 |
SAM-e Engineering
(l)
Tubes and headers shall accommodate factory installation or field retrofit of optional
insulation for increased energy efficiency.
(2)
Options
(a)
Tube and header insulation constructed from 304 stainless steel shielding for
increased energy efficiency and reduced airstream heat gain. Stainless steel shields to
be isolated from distributor using plenum rated synthetic foam strips. Insulation to
provide air-gap to minimize conduction and convection, as well provide reflective
surface to minimize radiating heat transfer. (Patent Pending). Un-insulated headers,
or simple foam insulation not accepted.
(b)
Adjustable mounting frame available for quick and easy installation. (Does not apply
for Mini SAM-e).
(3)
Standard of acceptance: Nortec SAM-e.
3.
EXECUTION
A.
Examination
(1)
Examine ducts, air-handling units, and conditions for compliance with requirements for
installation tolerances and other conditions affecting performance.
(2)
Examine roughing-in for piping systems to verify actual locations of piping connections
before humidifier installation.
(3)
Proceed with installation only after unsatisfactory conditions have been corrected.
B.
Installation
(1)
Install humidifiers and steam dispersion panels per manufacturers‟ instructions.
(2)
Seal humidifier dispersion-tube duct penetrations with flange.
(3)
Install with required clearance for service and maintenance.
C.
Testing
(1)
System verification testing is part of the commissioning process. Verification testing shall
be performed by the Contractor and witnessed and documented by the Commissioning
Authority. Refer to section 01810, Commissioning, for system verification tests and
commissioning requirements.
XXXXX OR XXXXX
(2)
Manufacturer‟s Field Service: Engage a factory-authorized service representative to
inspect field-assembled components and equipment installation, including piping and
electrical connections. Report results in writing.
(a)
Leak Test: After installation, charge system and test for leaks. Repair leaks and
retest until no leaks exist.
(b)
Operational Test: After electrical circuitry has been energized, start units to confirm
proper unit operation. Remove malfunctioning units, replace with new units, and
retest.
(c)
Test and adjust controls and safeties. Replace damaged and malfunctioning controls
and equipment.
D.
Training
Содержание SAM-e
Страница 5: ...SAM e Engineering 2 Figure 1 SAM e Figure 2 Cross section of distributor pipe ...
Страница 9: ...SAM e Engineering 6 Figure 3 General SAM e Dimensions ...
Страница 12: ...9 SAM e Engineering Figure 4 General Mini SAM e Dimensions ...
Страница 14: ...11 SAM e Engineering Product Selection ...
Страница 16: ...13 SAM e Engineering Figure 5 Header Separator Assembly Figure 6 SAM e Stand ...
Страница 34: ...31 SAM e Engineering Installation Drawings ...
Страница 35: ...SAM e Engineering 32 Figure 8 SAM e Exploded View ...
Страница 36: ...33 SAM e Engineering Figure 9 SAM e Insulated Exploded View ...
Страница 37: ...SAM e Engineering 34 Figure 10 Mini SAM e Insulated Exploded View ...
Страница 39: ...SAM e Engineering 36 Figure 12 Typical SAM e Installation for Atmospheric Steam Applications ...
Страница 40: ...37 SAM e Engineering Figure 13 SAM e Internal Baffle Plate ...
Страница 41: ...SAM e Engineering 38 Figure 14 Typical Mini SAM e Installation for Pressurized Steam Applications ...
Страница 42: ...39 SAM e Engineering Figure 15 Typical Mini SAM e Installation for Atmospheric Steam Applications ...
Страница 43: ...SAM e Engineering 40 Specification ...
Страница 49: ...SAM e Engineering 46 Figure 1 KIT 7 8 Header and Adapter Configuration ...
Страница 50: ...47 SAM e Engineering Figure 2 Kit 1 Header and Adapter Configuration ...
Страница 51: ...SAM e Engineering 48 Figure 3 KIT 2 Header and Adapter Configuration ...
Страница 52: ...49 SAM e Engineering Figure 4 KIT 3 Header and Adapter Configuration ...
Страница 53: ...SAM e Engineering 50 Figure 5 KIT 4 Header and Adapter Configuration ...
Страница 54: ...51 SAM e Engineering Figure 6 KIT 5 Header and Adapter Configuration ...
Страница 55: ...SAM e Engineering 52 Figure 7 KIT 5 Header and Adapter Configuration ...
Страница 56: ...53 SAM e Engineering Figure 8 KIT 5 Header and Adapter Configuration ...
Страница 57: ...SAM e Engineering 54 Figure 9 KIT 6 Header and Adapter Configuration ...
Страница 58: ...55 SAM e Engineering Figure 10 KIT 6 Header and Adapter Configuration ...
Страница 59: ...SAM e Engineering 56 Figure 11 KIT 6 Header and Adapter Configuration ...
Страница 60: ...57 SAM e Engineering Figure 12 KIT 7 Header and Adapter Configuration ...
Страница 61: ...SAM e Engineering 58 Figure 13 KIT 7 Header and Adapter Configuration ...
Страница 62: ...59 SAM e Engineering Figure 14 KIT 7 Header and Adapter Configuration ...
Страница 63: ...SAM e Engineering 60 Figure 15 KIT 8 Header and Adapter Configuration ...
Страница 64: ...61 SAM e Engineering Figure 16 KIT 8 Header and Adapter Configuration ...
Страница 65: ...SAM e Engineering 62 Figure 17 KIT 8 Header and Adapter Configuration ...
Страница 66: ...63 SAM e Engineering Figure 18 KIT 23 Header and Adapter Configuration ...
Страница 67: ...SAM e Engineering 64 Figure 19 KIT 24 Header and Adapter Configuration ...
Страница 68: ...65 SAM e Engineering Figure 20 KIT 25 Header and Adapter Configuration ...
Страница 69: ...SAM e Engineering 66 Figure 21 KIT 25 Header and Adapter Configuration ...
Страница 70: ...67 SAM e Engineering Figure 22 KIT 25 Header and Adapter Configuration ...
Страница 71: ...SAM e Engineering 68 Figure 23 KIT 26 Header and Adapter Configuration ...
Страница 72: ...69 SAM e Engineering Figure 24 KIT 26 Header and Adapter Configuration ...
Страница 73: ...SAM e Engineering 70 Figure 25 KIT 26 Header and Adapter Configuration ...
Страница 74: ...71 SAM e Engineering Figure 26 KIT 27 Header and Adapter Configuration ...
Страница 75: ...SAM e Engineering 72 Figure 27 KIT 27 Header and Adapter Configuration ...
Страница 76: ...73 SAM e Engineering Figure 28 KIT 28 Header and Adapter Configuration ...
Страница 77: ...SAM e Engineering 74 Figure 29 KIT 29 Header and Adapter Configuration ...
Страница 78: ...75 SAM e Engineering Figure 30 KIT 30 Header and Adapter Configuration ...
Страница 79: ...SAM e Engineering 76 Figure 31 KIT 30 Header and Adapter Configuration ...
Страница 80: ...77 SAM e Engineering Figure 32 KIT 30 Header and Adapter Configuration ...
Страница 81: ...SAM e Engineering 78 Figure 33 0 5 NPT Mini Header and Inlet Configuration ...
Страница 82: ...79 SAM e Engineering Figure 34 0 75 NPT Mini Header and Inlet Configuration ...
Страница 83: ...SAM e Engineering 80 Figure 35 1 NPT Mini Header and Inlet Configuration ...
Страница 84: ...81 SAM e Engineering Figure 36 0 875 Mini Header and Inlet Configuration ...
Страница 85: ...SAM e Engineering 82 Figure 37 1 75 Mini Header and Inlet Configuration ...
Страница 86: ...83 SAM e Engineering Figure 38 3 Mini Header and Inlet Configuration ...