10-20
Page 2
2008-02-15
(1) FIELD CONVERSION OF A NHTC SERIES HUMIDIFIER WITH NORTEC
LINKS 2
BACNET, LONWORKS AND N2 MODULES:
Figure 1. Component Identification
A. MOUNT THE LINKS 2 ASSEMBLY
(1) The Nortec LINKS 2 assembly mounts on the top, right corner of the electrical
compartment.
(2) Ensure that the rear, upwards facing hook engages the proper cooling louver at the
back of the humidifier cabinet.
(a)
Fasten the bracket assembly to the humidifier ‘top’ using the 3 8-32 X ½” self-
tapping screws provided with the kit.
LAN Router
or Switch
(BACnet/IP)
OnLine
Module
LINKS 2
Module
Router Power
Supply
Содержание GSTC
Страница 1: ...Manual No H 504 2008 02 15 RETROFIT INSTRUCTIONS FOR GSTC SETC NHTC NHDI NHSC Installation Manual TM ...
Страница 4: ...10 00 Page 1 2008 02 02 10 00 LINKS 2 FIELD INSTALLATION OF A SE 50 ...
Страница 6: ...10 10 Page 1 2008 02 15 10 10 LINKS 2 FIELD CONVERSION OF A GSTC SETC ...
Страница 10: ...10 20 Page 1 2008 02 15 10 20 LINKS 2 FIELD CONVERSION OF A NHTC ...
Страница 12: ...10 20 Page 3 2008 02 15 Figure 2 Hook Position Figure 3 Assembly Mounting Location Hook Position Hook Position ...
Страница 14: ...10 30 Page 1 2008 02 15 10 30 LINKS 2 FIELD CONVERSION OF A NHDI SC ...