![NORSELIGHT 7070404023366 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/norselight/7070404023366/7070404023366_user-manual_1705641015.webp)
6500201 Rev - SH R50
15
3
Installation
Mechanical installation
•
The searchlight must be mounted on a horizontal surface using 4 stainless screws.
•
The Main/Slave Operation Panel and the Switch is designed for installation in indoor applications.
•
The Access Point is designed for out side installation.
Electric installation
•
The Main Operation Panel requires 24V DC connected in series with a 1A fuse to the positive (+) conductor.
•
The Switch requires 24V DC. In addition to grounding
•
Depending on The Searchlight model, it requires 24VDC, 115VAC or 230VAC.
Note:
Disconnect the power when working on the equipment!
Electrical equipment must be installed by authorised personnel!
Check the polarity when connection of 24VDC!
All Searchlight system equipment MUST BE connected to ground/earth!
BUS installation
•
The BUS communication system requires minimum LAN CAT5e, 4 pair shielded twisted pair cable.
•
All connection entries need RJ45 connector using T-568B cable standard.
•
Make sure that all cable entries maintain their shield protection.
Note:
Follow the installation requirements from your cable supplier!
Avoid brakeage on the Ethernet connectors (panel, switch and searchlight COM-
module)!
Start up procedure
•
Powering up.
By powering up the SCS R50 Searchlight system, the panel indicate splashing
figure in LED display of the Operating Panel. The system starts to search for all units
connected to the system. After few seconds a specific number of the searchlight in
contact, will appear in the LED display.
•
Position Calibration
Turn the searchlight to Starboard side by using the Joystick turning non stop until T
appears in LED-indication of the Main Operation Panel. Then turn to Port side non
stop to the end position until T appears in LED-indication. Now the searchlight
position indication will follow the movement of the searchlight 360
o
.
4
Operation
Operation Panels function
LED-indication display:
•
Searchlight number in use
Содержание 7070404023366
Страница 1: ...USER S MANUAL SEARCHLIGHTS SH R50 BUS 7SL2001001 Rev02 DCN 22877 22 05 2018 ...
Страница 6: ...6500201 Rev SH R50 6 Main and Slave Operation Panel ...
Страница 20: ...6500201 Rev SH R50 20 Spare Parts SH 260 470 R50 BUS ...
Страница 21: ...6500201 Rev SH R50 21 Spare Parts SH 480 R50 BUS ...
Страница 22: ...6500201 Rev SH R50 22 Drawings Mechanical Dimensions SH 260 to 470 R50 ...
Страница 23: ...6500201 Rev SH R50 23 ...
Страница 24: ...6500201 Rev SH R50 24 Mechanical Dimensions SH 480 R50 ...
Страница 25: ...6500201 Rev SH R50 25 Pedestal R50 ...
Страница 26: ...6500201 Rev SH R50 26 Operation Panel Main and Slave w cut dimensions ...
Страница 28: ...6500201 Rev SH R50 28 Ethernet BUS LAN Cables only ...
Страница 29: ...6500201 Rev SH R50 29 ...
Страница 30: ...6500201 Rev SH R50 30 ...
Страница 31: ...6500201 Rev SH R50 31 Electrical installation SH 260 and 310 24V DC ...
Страница 32: ...6500201 Rev SH R50 32 Electrical installation SH 310 to 480 115 230V AC ...
Страница 33: ...6500201 Rev SH R50 33 Halogen Cable oveview ...
Страница 36: ...6500201 Rev SH R50 36 Connecting diagram Main and Slave Operation Panel ...
Страница 37: ...6500201 Rev SH R50 Internal wire diagram SH 260 and 310 R50 24V DC ...
Страница 38: ...6500201 Rev SH R50 SH 310 to 480 115 230V AC ...
Страница 40: ...6500201 Rev SH R50 7 Owner s NOTES ...