4
Quot
a 0
x
Quota level
2 Material supplied
- Packet with pre-assembled sections
- Packet with the tracks, springs and shafts.
- Box with the hardware fittings
2.1 Tools required
The tools needed to assembly the door are
not supplied by
NORPA.
- Drill
- Bits
- Socket spanner set
- Set of Allen keys
- Different types of screwdrivers
(slotted and Philips)
- Hacksaw
- Different types of pliers
- Vice grips
- Ladder or scaffolding
- Level and water hose level
- Tape measure
All necessary personal protection items
should also be worn.
3 . C h e c k i n g t h e
measurements
It is essential to take each and every
measurement indicated in the diagram.
The door will be manufactured to
the measurements indicated on
the order, making it custom-built
to suit that particular doorway.
Warning!
Before installing the door, re-check all the
measurements. The precise levelling of the
vertical tracks is the most important step in
the installation process.
Any errors at this stage cannot be corrected
later, and will cause the door to malfunction.
4. Installation of the
vertical tracks
For correct levelling, on one side of the door
opening, use a tape measure to measure
one metre up from the finished floor or,
by default, from the exact height at which
the floor is to be finished.
Once the 1 metre mark has been made,
transfer this measurement to the other
MT10051002-GB /10-09-27
GB
RESIDENTIAL SECTIONAL GARAGE DOORS
INSTALLATION, USE & MAINTENANCE MANUAL
DOORS AND AUTOMATION SYSTEMS