1
TDMG0002 Icon-5 Maintenance Guide
– Version: 02 – Release date: 2020-04-27
Icon-5 Maintenance Guide
Kit description and procedures
This document describes the contents of the maintenance kit and list the corresponding
maintenance procedures for Norma Icon-5 automated hematology analyzer.
Special tool required:
UNF tool
(not included in the kit)
Please contact our support team at
clarification is required.
Icon-5 Maintenance Kit (HAT827A)
– for 1-year/10.000 sample period
Item
Part#
pcs
Aperture maintenance kit
HAT809A
1
Peristaltic pump tube set for “gray” and “orange”
pumps
HAT800B
HAT800C
1 pair of each
Lubricants (in small containers)
-
Shell Retinax lubricant (red)
HAT829A
1
-
Teflon based grease (white)
HAT829B
1
-
Silicone grease (clear)
HAT829C
1
Piercing needle with UNF screw and “O” ring
HAT165A
1
Greiner BIO Vacutainer NO add w/o rubber in cap
(White)
HAT823B
1