
12
Step
Installation Procedure(ex. @Garage)
Necessary Tool
6 Push the
"
⑮
Flex Feeder"
into the tip of the
"
③
Flex Pipe 2""
.
③
Flex Pipe 2"
⑮
Flex Feeder
7 Insert the
"
③
Flex Pipe 2""
into the
"
⑥
Base Junction Support"
until you touch the
inside of the rain cap on the roof.
With the
"
③
Flex Pipe 2""
fully inserted into the vent, make a mark at the "
⑥
Base
Junction Support"
so you can check for movement during the rest of installation.
Marker
Step-1
(W
ork where equipment is installed)
Install the
"
⑮
Flex Feeder"
always, even in the case of straight B-Vent runs.
(
"
⑮
Flex Feeder"
prevents debris from falling into the
"
③
Flex Pipe 2""
.)
Be sure to do
When pushing
"
③
Flex Pipe 2""
through the B-Vent, if there is unusual feeling
(touching the bump of screw, etc.), do not continue to push in and stop the installation.
Be sure to do
Do not use the
"
③
Flex Pipe 2""
at any jobsite with vent runs longer than 35', do
not join two shorter flex pipes together even if the run is less than 35'.
Prohibited
[Point]
Before inserting, try to straighten curl of the tip of
"
③
Flex Pipe 2""
as much as possible.
However, when doing so, bending radius should be more than 7 inch.
[Point]
Continue to push
"
③
Flex Pipe 2""
strongly until the end and make sure that it does not
stop in the middle.
r>7 inch