 WARNING:

CARBON MONOXIDE POISONING HAZARD

Failure to follow the steps outlined below for each appliance connected to the venting system 

being placed into operation could result in carbon monoxide poisoning or death. The following 
steps shall be followed with each individual appliance connected to the venting system being 
placed in operation, while all other appliances connected to the venting system are not in 
operation:

1.  Seal any unused openings in the venting system.
2.  Inspect the venting system for proper size and horizontal pitch, as required in the 

National 

Fuel Gas Code, ANSI Z223. 1/NFPA 54 or the CSA B149.1, Natural Gas and Propane Installation 
Codes 

and these instructions. Determine that there is no blockage or restriction, leakage, 

corrosion and other defi ciencies which could cause an unsafe condition.

3.  As far as practical, close all building doors and windows and all doors between the space 

in which the appliance(s) connected to the venting system are located and other spaces 
of the building.

4. Close fi replace dampers.
5.  Turn on clothes dryers and any appliance not connected to the venting system. Turn on 

any exhaust fans, such as range hoods and bathroom exhausts, so they are operating at 
maximum speed. Do not operate a summer exhaust fan.

6.  Follow the lighting instructions. Place the appliance being inspected into operation. Adjust 

the thermostat so appliance is operating continuously.

7.  Test for spillage from draft hood equipped appliances at the draft hood relief opening after 

5 minutes of main burner operation. Use the fl ame of a match or candle.

8. If improper venting is observed during any of the above tests, the venting system must 

be corrected in accordance with the 

National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or 

CSA B149.1, Natural Gas and Propane Installation Codes

.

9.  After it has been determined that each appliance connected to the venting system properly 

vents when tested as outlined above, return doors, windows, exhaust fans, fi replace 
dampers and any other gas-fi red burning appliance to their previous conditions of use.

UPFLOW/HORIZONTAL INSTALLATION CLEARANCES*

Left Side .................0 Inches

Back ...........................0 Inches

Right Side ............. 0 Inches

Top ............................. 0 Inches

Vent ...........................1 Inch

Front......................... 4 Inches

*

 Allow 24 in. minimum clearance for servicing. 

Recommended clearance is 36 in.

 The IFGC requires that single wall metal vent connectors 

must maintain a minimum 5” clearance to combustibles, 
including the outer casing of the furnace.

NOTE: 

This furnace is listed for installation on combustible 

or non-combustible fl ooring. However, wood is the only 
combustible fl ooring allowed for installation.

LEFT SIDE

RIGHT SIDE

BOTTOM

TOP

SIDE

BO

TT

OM

TO

P

SIDE

Table 1. Minimum Clearances to Combustible Materials

UPFLOW APPLICATION

HORIZONTAL APPLICATION 

Содержание G7XA Series

Страница 1: ...uture reference GAS FURNACE Installation Instructions Upflow Horizontal Model 80 AFUE DO NOT DESTROY THIS MANUAL KEEP IN A SAFE PLACE FOR FUTURE REFERENCE FIRE OR EXPLOSION HAZARD Failure to follow sa...

Страница 2: ...2...

Страница 3: ...lication 12 Conversion to LP Propane 13 ELECTRICAL WIRING 13 Low Voltage Wiring 13 Line Voltage Wiring 13 Twinning 14 Grounding 15 START UP ADJUSTMENTS 15 Pre Start Checklist 15 Start Up Procedures 15...

Страница 4: ...uld not be ignored WARNING indicates a potentially hazardous situation that if not avoided could result in personal injury or death CAUTION indicates a potentially hazardoussituationthatifnotavoided m...

Страница 5: ...e lighting instructions Place the appliance being inspected into operation Adjust the thermostat so appliance is operating continuously 7 Test for spillage from draft hood equipped appliances at the d...

Страница 6: ...trevisionoftheIFGC Consult local codes for special requirements CAUTION Exhaust fans clothes dryers fireplaces and other appliances that force air from the house to the outdoors can create a negative...

Страница 7: ...ches Figure 3 Combustion Air Drawn from Outside Through Vertical Ducts Inlet Air Duct must be at least 1 sq in per 4 000 Btuh of total input rating Inlet and Outlet Ducts must extend above attic insul...

Страница 8: ...s or turns All horizontal runs shall slope upwards from the furnace at inch per running foot of vent Supports for the vent pipe must be installed a minimum of every five feet along the vent run to ens...

Страница 9: ...he furnace blower to provide airflow over the indoor coil the coil must be installed downstream on the outlet side of the furnace or in parallel with the furnace If a cooling system is installed in pa...

Страница 10: ...he duct system See Bottom Panel Removal section Ifthefurnacewillbesuspendedfromtheceiling assemble a support frame Figure 7 using slotted iron channel and full threaded rod Fasten the frame together w...

Страница 11: ...must be resistant to the actions of LP propane gas The main gas valve and main power disconnect to the furnace must be properly labeled by the installer in case emergency shutdown is required A drip...

Страница 12: ...at sea level WARNING Thereductionofinputratingnecessaryforhigh altitude installation may only be accomplished with factory supplied orifices Do not attempt to drill out orifices in the field Improper...

Страница 13: ...replacing any of the original wires supplied with the furnace the replacement wire must be copper wiring and have a temperature rating of at least 105 F 40 C Low Voltage Wiring The thermostat must be...

Страница 14: ...45 ft 20 140 ft 70 ft 18 225 ft 110 ft Table 2 Wire Length and Voltage Specifications FURNACE W G Y C R THERMOSTAT W G Y C R W G Y R A C MOTOR TWIN TERMINAL BOARD UNIT BOARD FURNACE BOARD MOTOR TWIN T...

Страница 15: ...t input rate perform these steps Grounding WARNING Tominimizepersonalinjury thefurnacecabinet musthaveanuninterruptedorunbrokenelectrical ground The controls used in this furnace require an earth grou...

Страница 16: ...TWIN DHUM W1 THERMOSTAT EXPANSION PORT COOL HEAT FAN SPEED 1 2 3 4 5 6 7 8 OFF ON CONNECTION TERMINAL TO TWIN FURNACES Figure 15 Motor Control Board Verifying Burner Operation CAUTION The door over t...

Страница 17: ...a call for cooling occurs during continuous fan the blower will switch over to the selected COOL speed IftheWterminalreceivesacallforheatduringcontinuous fan the blower will de energize A call for fa...

Страница 18: ...iping at the furnace 8 Remove the piping between the gas valve and the ground joint union If applicable 9 Remove all screws securing the burner assembly to the furnace 10 Carefully remove the burner a...

Страница 19: ...provided online Blower Limit Switch Blower switches prevent operation when blower is not operational Flame Sensor The flame sensor verifies when a flame has carried over from the igniter to the opposi...

Страница 20: ...ace operates when the Blower Limit Switch is reset contact a qualified service technician to identify and repair the problem If the furnace still doesn t operate check the Flame Roll out Switches Figu...

Страница 21: ...PANEL FRONT BRACE LEFT SIDE RIGHT SIDE BOTTOM VIEW FLANGES TOP VIEW ACCEPTS 4 TYPE B VENT PIPE 23 1 HOLE FOR THERMOSTAT HOLE FOR ELECTRIC HOLE FOR ELECTRIC Figure 16 Furnace Dimensions XA Model s Dim...

Страница 22: ...54 795 56 765 58 730 61 1 1 1 0 1000 44 970 46 940 47 910 49 880 51 850 52 820 54 790 56 0 0 0 1 1075 41 1045 43 1015 44 985 45 960 46 925 48 900 49 870 51 1 0 0 1 1110 40 1080 41 1055 42 1025 43 1000...

Страница 23: ...0 0 0 1395 57 1350 59 1305 61 1260 63 1210 66 1165 68 1 0 0 0 1465 54 1420 56 1375 58 1330 60 1290 61 1245 64 1200 66 0 1 0 0 1555 51 1510 52 1470 54 1425 56 1380 57 1340 59 1295 61 1250 63 1 1 0 0 1...

Страница 24: ...AN SPEED HEAT HIGH COOL FAN HEAT MH ML LOW GREEN BLACK WHITE YELLOW YELLOW BLACK RED BLACK BLACK BLACK GREEN BLACK BLACK WHITE BLACK WHITE RED GREY WHITE BLACK WHITE NEUTRAL BLACK 208 240V GROUND For...

Страница 25: ...3 346 50 72 360 720 106 34 170 340 52 69 346 692 108 33 167 333 54 67 333 667 110 33 164 327 56 64 321 643 112 32 161 321 58 62 310 621 114 32 158 316 60 60 300 600 116 31 155 310 62 58 290 581 118 31...

Страница 26: ...9 0 9 0 MANIFOLD PRESSURE 8 000 to 10 000 FT 51 51 51 51 ORIFICE SIZE 8 5 8 5 8 5 8 5 MANIFOLD PRESSURE Table 9 High Altitude Deration Propane Gas PROPANE ALTITUDE ABOVE SEA LEVEL INPUT BTU 46 000 61...

Страница 27: ...lve 9 Igniter 10 Inducer Assembly 11 Main Air Limit Switch 12 Motor Control Board 13 Pressure Switch 14 Transformer LOCATION OF FURNACE COMPONENTS Figure 18 Upflow Horizontal Gas Furnace R C Y G W STA...

Страница 28: ...esh air supply for combustion and ventilation YES NO Installation Altitude ____________________ FT Deration Percentage ___________________ Furnace Input _______________________ Btuh Supply Air Tempera...

Отзывы: