Nordyne C6DA-T Скачать руководство пользователя страница 3

3

1.  GENERAl INFORMATION

C(*)DA coils are designed for upflow and down-
flow furnace/air handler applications. The C(*)DA 
coils are furnished with down-turned refrigerant 

connections, ready for brazing.

Read the installation manual supplied with the 

outdoor unit for refrigerant line connection pro

-

cedure, required line sizes, and other information 
pertaining to the system installation.

1.  Make certain that the air delivery of the 

furnace/air handler is adequate to handle 
the static pressure drop of the coil, filter, and 

duct work.

2.  In orifice style models check the orifice size 

of the coil's expansion device and confirm 

that  it  is  suitable  for  application  with  the 

intended outdoor unit.

3.  Where precise forming of the refrigerant 

lines is required, a copper tubing bender 

designed for the size lines used is recom-

 

mended. Avoid sharp bends and contact of 
the refrigerant lines with metal surfaces.

4.  Refrigerant  lines  should  be  wrapped 

with pressure sensitive neoprene or other 
suitable material where they pass through 
the raw edges of holes.

5.  The coil enclosure (if provided) and suction 

line must be insulated as needed to prevent 
condensate from forming and causing 
property damage.

6.  Coil  must  be  level  for  proper  conden-

sate drainage.

7.  Do not remove seals from the coil until the 

tubing connections are ready to be made.

NOTE:

  Optional cooling/heating equipment must 

be properly sized and installed in accordance 

with the furnace manufacturer’s specifications 
and approved recommendations. “Heating only” 

furnace air circulators may have to be replaced 

with  multi-speed  “Heating/Cooling”  blowers  to 
upgrade the air delivery (CFM) when an add-on 
coil is installed. Refer to Coil Specifications for 
recommended CFM and allow for pressure drop 

across the coil and filters.

2. COIl SPECIFICATIONS

1.  Refer to sales specification sheets 

for Listed/Certified combinations 

of equipment and required acces

-

sories.

2.  Refer  to  the  current  ARI  Direc-

tory for certified ratings of split 
systems.

Nominal (2)           
Capacity BTUH
Nominal Airflow        
CFM
Width (in.) W
Height (in.) H
Depth (in.) D
Connections

Liquid Line

Suction Line

Installed Orifice 
Size (in.)

Extra Orifice 
(in.) supplied

0.060

(use for 024)

0.075

(use for 042)

0.063

(use for 030)

N/A

N/A

C3DA

C5DA

T25

T30

T36

T37

T41

T43

T47

T48

T49

T60

Nominal (2) 
Capacity BTUH

24,000 30,000 36,000 36,000 42,000 42,000 48,000 48,000 48,000 60,000

Nominal Airflow 
CFM

800

1000

1200

1200

1400

1400

1600

1600

1600

2000

Width (in.)

18 1/8

18 1/8

18 1/8

18 1/8

18 1/8

18 1/8

18 1/8

18 1/8

21

21

Height (in.)

20

20

20

20

20

24

20

24

28

28

Depth (in.)

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

19 1/2

Connections

liquid line

3/8

3/8

3/8

3/8

3/8

3/8

3/8

3/8

3/8

3/8

Suction line

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

3/4

Metering Device

TXV

TXV

TXV

TXV

TXV

TXV

TXV

TXV

TXV

TXV

Содержание C6DA-T

Страница 1: ...licensed installation service personnel for this type of equipment Read all instructions carefully before starting the installation CAUTION Read the installation instructions supplied with the furnac...

Страница 2: ...Downflow Electric Furnace Downflow Electric Furnace Air Handler with Integral Coil Cabinet or Optional Coil Cabinet 4 Verify Pressurization 5 5 Refrigerant Line Connections 6 6 Completing the Install...

Страница 3: ...nnections are ready to be made NOTE Optionalcooling heatingequipmentmust be properly sized and installed in accordance with the furnace manufacturer s specifications and approved recommendations Heati...

Страница 4: ...l it as needed to ensure proper condensate drainage 6 Secure the coil hold down bracket with screws 7 Add air filters to the sides of the coil 8 Cut the floor opening for the refrigerant lines and dra...

Страница 5: ...caping Al ways ensure adequate ventilation is present during the depressurization process Any uncertainties should be addressed before proceeding VERIFY PRESSURIZATION TestbydepressingSchradervalveand...

Страница 6: ...the assembly nut to separate it from the distributor body 4 Insert a light gauge wire hook between the distributor body and the restrictor orifice to lift the orifice out of the body See Figure 10 Car...

Страница 7: ...ng structural damage premature equipment failure or pos sible personal injury Condensate Drain 1 Thread the 3 4 drain fitting included into the lowest tapped hole on the condensate pan Hand tighten th...

Страница 8: ...setpriortocharging Refertotheoutdoor unit installation manual for detailed charging instructions 7 MAINTENANCE AND SERVICE To ensure optimum system performance and to minimize the possibility of equip...

Отзывы: