Figure 22.  Line Voltage Field Wiring

Field Supplied Disconnect 
Within Sight of Furnace

Field Supplied

Panel Connector

Field Supplied

Fused Service

Panel

Black (Hot)

White (Neutral)

Green or Bare

(Ground)

Black

White

Black

White

Black

White

Field Line Voltage
Wiring

Factory Line
Voltage Wiring

Ground

Ground

Ground

Junction Box (may be internal
or external to the furnace). These
connections can be made in the
field supplied disconnect at the
furnace.

Low Voltage Wiring

Install the thermostat per the manufacturer’s instructions.
The low voltage (24 volt) connections from the thermostat
are made at the terminal strip on the integrated control  in
the furnace. See Figure 18  for the proper connections for
heating only (two-wire) and heating/cooling (four-wire)
applications.  The recommended minimum wire gauge for
thermostat wiring is shown in Table 10.

The thermostat must not be installed on an outside wall or
any other location where its operation may be adversely
affected.  Adverse affects include radiant loading from
fireplaces, sunlight, or lighting fixtures, and convective
loading from warm air registers or electrical appliances.

To determine the heat anticipator setting either:

1.

Add the current draw of the system components; or

2.

Measure the current flow on the  thermostat  R-W
circuit after the circulating blower motor has started.

Set the heat anticipator according to the thermostat
manufacturer’s instructions for heat anticipator settings.

START-UP AND ADJUSTMENTS

General

Prior to start-up, verify that:

1.

The line voltage power leads are securely connected,
that the polarity of the connections is correct, and
that the furnace is properly grounded.

2.

The thermostat wires (R, W, Y, and G) are securely
connected to the correct leads on the terminal strip
of the circuit board.

3.

The gas line service pressure does not exceed 10.0
in. water column  (0.36 psig), and is not less than 4.5
in. water column (0.16 psig) for natural gas.  For LP
gas the line service pressure must not exceed 14 in.
water column  (0.51 psig), and must not be less than
11.0 in. w.c. (0.40 psig).

4.

The roll-out and vent safety manual reset switches
are closed.  If necessary, press the red button to
reset a switch.  DO NOT install a jumper wire across

a switch to defeat its function.  If a switch reopens
on start-up, DO NOT reset the switch without
identifying and correcting the fault condition which
caused the switch to trip.

5.

The blower door is in place, closing the door switch
in the line voltage circuit.

6.

The gas line has been purged and all connections are
leak tight.

Start-up Procedures

After all of the above checks have been made:

1.

Set the thermostat to the lowest setting.

2.

Close the disconnect(s) to provide line voltage to the
furnace.

3.

Follow the procedures given on the operating
instruction label attached to the furnace.

4.

Set the thermostat above room temperature and
verify the operating sequence. (See the 

Sequence

of Operation)

.

5.

After the furnace has run for approximately five
minutes, set the thermostat below room temperature
and verify steps (9) through (11) of the 

Sequence of

Operation.

Verifying and Adjusting Firing Rate

The firing rate must be verified for each installation to
prevent over-firing  the furnace.

IMPORTANT NOTE:
The firing rate must not exceed the rate shown on the
furnace rating plate. At altitudes above 2000 feet it must
not exceed that on the rating plate less 4% for each 1000
feet.

Follow the procedure below to determine the firing rate.

1.

Shut off all other gas fired appliances.

2.

Start the furnace and allow it to run for at least three
minutes.

Содержание 060C-12

Страница 1: ...assist qualified individuals experienced in the proper installation of this appliance Some local codes require licensed installation service personnel for this type of equipment Read all instructions...

Страница 2: ......

Страница 3: ...er Venting 17 Location of Outdoor Terminations 17 Horizontal Installation 17 Flexible Vent Systems 19 Circulating Air Supply 19 20 General 19 Return Air 19 Gas Supply and Piping 20 22 General 20 Leak...

Страница 4: ...Air Opening Bottom 7 8 FURNACE SPECIFICATIONS Upflow Horizontal Models Figure 1a Upflow Unit Dimensions Table 1a Upflow Furnace Dimensions and Shipping Weights Furnace Dimensions Shipping Model Input...

Страница 5: ...Bottom Opening Bottom Opening 10 1 4 24 1 2 19 3 4 Table 1B Downflow Furnace Dimensions and Shipping Weights Model Furnace Shipping Number Input A B C Weights RK Btuh inches inches inches lbs 060C 12...

Страница 6: ...880 0 0 1 0 650 945 1 0 0 1 720 1050 1 0 0 0 800 1155 1 0 1 0 900 1305 0 1 0 1 1000 1450 0 1 0 0 1060 1530 1 1 0 1 1100 1595 0 1 1 0 1170 1700 1 1 0 0 1290 1870 1 1 1 0 CFM SWITCH NUMBER 2 TON 3 5 TON...

Страница 7: ...publications are available from National Fire Protection Association Inc Batterymarch Park Quincy Massachusetts 02269 WARNING This furnace is not approved for installation in mobile homes Installation...

Страница 8: ...Aconfinedspaceisanareawithvolumelessthan50cubic feet per 1 000 Btuh of the combined input rates of all WARNING Do not place combustible material on or against the furnace cabinet or within 6 inches of...

Страница 9: ...protected to avoid physical damage by vehicles WARNING Donotplacecombustiblematerialonoragainst the furnace cabinet or within 6 inches of the vent pipe Do not place combustible materials including gas...

Страница 10: ...or Type Standard Single Wall Metal Vent Type B 1 Double Wall Metal Vent LEFT SIDE 0 0 RIGHT SIDE 5 0 VENT 6 1 BACK 0 0 BOTTOM 0 0 TOP 1 1 FRONT 4 4 UPFLOW DOWNFLOW INSTALLATION CLEARANCES LEFT SIDE RI...

Страница 11: ...alled directly on combustible wood flooring or supports if type B 1 vent pipe is used See Figure 4 It is recommended for further reduction of fire hazardthatcementboardorsheetmetalbeplacedbetween the...

Страница 12: ...0 000 100 000 120 000 140 000 160 000 Minimum Free Area Each Opening 10 sq in 15 sq in 20 sq in 25 sq in 30 sq in 35 sq in 40 sq in Round Duct Diameter 4 5 5 6 6 7 8 Furnace Water Heater Vent or Chimn...

Страница 13: ...a chimney serving a fireplace the fireplace must be sealed off from the chimney For Category I furnace installations the furnace shall be connectedtoafactorybuiltchimneyorventcomplyingwith a recognize...

Страница 14: ...burner operation Use the flame of a match or candle 8 If improper venting is observed during any of the above tests the venting system must be corrected in accordance with the NationalFuelGasCode ANSI...

Страница 15: ...thends of the bleed tube Do not cover the hole in the bleed tube Place the assembly back on the pressure switch sensor tube and the collector pan sensor tube See Figure 12 2 Remove the nut and restric...

Страница 16: ...pipes and fittings or using support straps All jointsmustbesealedwithhightemperaturesiliconebefore locking bands are installed If the lengths of pipe must be cut the joint must still be sealed with si...

Страница 17: ...nsareprovidedwiththekit Installation must conform to those instructions and applicable requirements of local codes WARNING The entire vent system must be sealed with a high temperature sealant which w...

Страница 18: ...100 00 Btuh 30 kW 36 inches 91 cm for appliances 100 00 Btuh 30 kW 4 feet 1 2 m below or to side of opening 1 foot 300 mm above opening C Clearance to permanently closed window D Vertical clearance t...

Страница 19: ...alf Inner Shield 41 2 Dia Wall Thimble Outer Half Outer Overlapping Shield 61 2 Dia 3 Termination Tee Protective Screen Inside Combustible Wall Inside Combustible Wall 3 Vent Pipe Outside Combustible...

Страница 20: ...e casing to avoid unwanted noise and or damage to the furnace All gas piping must be installed in compliance with local codes and utility regulations Some local regulations requiretheinstallationofama...

Страница 21: ...80 170 1 1 4 1050 730 590 500 440 400 370 350 1 1 2 1600 1100 890 760 670 610 560 530 The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas flow require...

Страница 22: ...ane sea level and high altitude is detailed in the installation instructions provided with the conversion kit Approved conversion kits are listed below UnitedStatesLP PropaneGasSeaLevelandHighAltitude...

Страница 23: ...ors can cause improper and dangerous operation Verify proper operation after servicing Thefurnacecabinetmusthaveanuninterrupted unbroken groundtominimizeinjuryshouldanelectricalfaultcondition occur Th...

Страница 24: ...rounded 2 The thermostat wires R W Y and G are securely connected to the correct leads on the terminal strip of the circuit board 3 The gas line service pressure does not exceed 10 0 in watercolumn 0...

Страница 25: ...the manifold pressure remove the regulator cap and turn the adjusting screw clockwise to increase pressure or counter clockwise to reduce pressure Replace the regulator cap after adjustments are compl...

Страница 26: ...airflows for other modes of operation exceptgasheat aredeterminedbythissetting Table1showstheairflowvaluesversustheairflowselector switch settings and the range of airflow settings recom mended for e...

Страница 27: ...furnace door is in place and that there is power to the furnace Set the thermostat to a temperature above room temperatureandobservetheignitionsequence Theburner flame should carry over immediately b...

Страница 28: ...ame Sensor The flame sensor acts to prove that flame has carried over from the igniter to the opposite end burner If no flame is sensed the furnace will shut down within 7 seconds of ignition Flame Ro...

Страница 29: ...season Newornewly renovatedhomesmayrequiremorefrequentchanginguntil the construction dust has been removed Filters for side return and bottom return applications are available from your local distribu...

Страница 30: ...WHITE STRIPES WHITE NEUTRAL BLACK 120V GROUND BLACK BLUE FLAME ROLL OUT SWITCH ALL MODELS PRESSURE SWITCH C 180 120 90 60 THERMOSTAT R Y G W YELLOW GREEN BLUE GREY RED YELLOW BLACK WHITE BLACK W W RED...

Страница 31: ...FF position 5 Disconnect the wires from the gas valve igniter flame sensor combustion air motor flame roll out switch blocked vent switch over temperature limit switch pressure switch CAUTION Label al...

Страница 32: ...ctions leak tested ________ Gas Line Pressure _________ in water column with furnace operating Manifold Pressure _________ in water column with furnace operating Is there adequate fresh air supply for...

Отзывы: