Operation of Furnace During Construction

 CAUTION:

Failure to follow these instructions will void the 
factory warranty and may signifi cantly reduce 
the life or the performance of the furnace, 
and/or result in other unsafe conditions. It is 
the responsibility of the installing contractor 
to insure these provisions are met.

Operating gas furnaces in construction environments can 
cause a variety of problems with the furnace. Proper use 
of commercial portable space heating equipment during 
construction is recommended. This gas furnace may be 
used during construction if it is not in violation of any 
applicable codes and the following criteria are met:

•  The installation must meet all applicable codes. The 

furnace must be permanently installed according to 
the instructions supplied with the furnace including 
electrical supply, gas supply, duct work and venting. The 
furnace must be controlled by a thermostat properly 
installed according to the instructions supplied with the 
furnace and thermostat. The installation must include 
a properly installed fi lter in the return air system with 
no by-pass air. The fi lter must be inspected frequently 
and replaced when necessary.

•  Combustion air must be supplied from outside the 

structure and located such that dust and gases 
from construction activity are not introduced into the 
combustion system.

•  Provisions must be made to insure that condensate 

does not freeze in the furnace or condensate drain lines 
during operation and during idle times; for example, 
overnight if turned off. (Condensing furnaces only)

•  Before occupying the structure: The fi lter must be 

replaced or cleaned, the duct work must be inspected 
and cleaned of any construction debris, and the furnace 
must be cleaned and/or repaired if found to be dirty, 
damaged, or malfunctioning in any way by a qualifi ed 
HVAC technician. The furnace shall be inspected and 
approved by applicable local authority even if this 
requires redundant inspections.

•  Serial numbers for furnaces used during construction 

must be submitted in writing (fax and email also 
acceptable). This information will be used to track the 
long-term affects of the use during construction on 
furnaces. Proof of this submittal shall be available for 
the fi nal inspection of the furnace prior to occupancy.

•  This furnace is designed to operate with return air 

temperatures in ranges normally found in occupied 
residences, including setbacks. Minimum continuous 
return temperature must not be below 60° F (15° C). 
Occasionally a temporary return temperature of 55° F 
(12° C) is acceptable. However, operation with a return 
temperature below 55° F (12° C) is not allowed.

GENERAL INSTRUCTIONS

Combustion Air Quality

 CAUTION:

Combustion air must not be drawn from a 
corrosive atmosphere.

To maximize heat exchanger life, the combustion air 
must be free of chemicals that can form corrosive acidic 
compounds in the combustion gases. The recommended 
source of combustion air is to use outdoor air. However, 
the use of indoor air in most applications is acceptable 
except as listed:

•  If the furnace is installed in a confi ned space, it is required 

that the necessary combustion air come from the 
outdoors by way of attic, crawl space, air duct, or direct 
opening. See Installation in a Confi ned Space section 
(pages 7 - 8) for combustion air requirements.

•  Installations in these locations may require outdoor air

 

for combustion, due to chemical exposures:

Commercial buildings

Buildings with indoor pools

Furnaces installed in laundry rooms

Furnaces installed in hobby or craft rooms

Furnaces installed near chemical storage areas

•  Exposure to the following substances in the combustion 

air supply may require outdoor air

 

for combustion:

Permanent wave solutions

Chlorinated waxes and cleaners

Chlorine based swimming pool chemicals

Water softening chemicals

De-icing salts or chemicals

Carbon tetrachloride

Halogen type refrigerants

Cleaning solvents (perchloroethylene)

Printing inks, paint removers, varnishes, etc.

Hydrochloric acid

Cements and glues

Antistatic fabric softeners

Masonry acid washing materials

Содержание 045C-23ASA

Страница 1: ...future reference GAS FURNACES Single Stage High Efficiency Furnaces Installation Instructions SA Upflow Horizontal Model SK Downflow Model 80 AFUE DO NOT DESTROY KEEP IN A SAFE PLACE FOR FUTURE REFERE...

Страница 2: ...n Air Inlet 9 Bottom Return Air Inlet 9 Horizontal Installation 9 Bottom Panel Removal 10 Downflow Installation 10 Installation on a Concrete Slab 10 VENTING REQUIREMENTS 12 Category I Venting 12 Hori...

Страница 3: ...naces 24 Figure 16 Downflow Furnaces 25 Airflow Data 26 Table 2 Upflow Horizontal Gas Furnaces 26 Table 3 Downflow Gas Furnaces 28 Electrical Information 29 Table 4 Wire length and Voltage Specs 29 Ta...

Страница 4: ...ting outside the space containing the furnace This furnace may be used for temporary heating of buildings or structures under construction See the guidelines listed on page 5 Agas firedfurnaceforinsta...

Страница 5: ...equires redundant inspections Serial numbers for furnaces used during construction must be submitted in writing fax and email also acceptable This information will be used to track the long term affec...

Страница 6: ...ance from the front of the unit is 36 inches The need to provide clearance for access to panels or doors may require clearance distances over and above the requirements COMBUSTION AIR REQUIREMENTS Gen...

Страница 7: ...ppliance input The openings shall exchange directly or by ducts with the outdoor spaces crawl or attic that freely exchange with the outdoors Figure 3 Figure 3 Combustion Air Drawn from a Crawl Space...

Страница 8: ...sq In 6 inches 140 000 35 sq In 7 inches 160 000 40 sq In 8 inches Furnace 12 Max Water Heater Vent or Chimney NOTES Each opening must be at least 100 sq in or 1 sq in per 1 000 Btuh of total input ra...

Страница 9: ...nstalled horizontally in an attic basement crawl space or alcove Figure 6 It can also be suspended from a ceiling in a basement or utility room in either a right to left airflow or left to right airfl...

Страница 10: ...built cased air conditioning coil However the plenum attached to the coil casing must be installed so that its surfaces are at least 1 from combustible construction Installation on a concrete slab 1 C...

Страница 11: ...en the space in which the appliance s connected to the venting system are located and other spaces of the building 4 Close fireplace dampers 5 Turn on clothes dryers and any appliance not connected to...

Страница 12: ...ventingsystemwillneed to be modified to comply with NFGC or local codes The venting system should be designed to have the minimum number of elbows or turns All horizontal runs shall slope upwards from...

Страница 13: ...uding carbon monoxide poisoning that could result in personal injury or death All return ductwork must be secured to the furnace with sheet metal screws For installations in confined spaces all return...

Страница 14: ...work may be connected to the left side right side or bottom The bottom panel Figure 15 page 24 must be installed for left or right return air NOTE Do not use the back of the furnace for return air Sid...

Страница 15: ...o avoid unwanted noise and or damage to the furnace A typical gas service hookup is shown in Figure 11 Leak Check WARNING FIRE OR EXPLOSION HAZARD Never test for gas leaks with an open flame Check all...

Страница 16: ...ecessaryforhigh altitude installation may only be accomplished with factory supplied orifices Do not attempt to drill out orifices in the field Improperly drilled orifices may cause fire explosion car...

Страница 17: ...tor for the proper upgrade motor kit IMPORTANTNOTE Settheheatanticipatoraccording to the instructions supplied by the thermostat manufacturer To determine the heat anticipator setting 1 Add the curren...

Страница 18: ...s on the terminal strip of the circuit board Verify the gas line service pressure does not exceed 10 0 inches of W C and is not less than 4 5 inches W C for natural gas For LP gas the line service pre...

Страница 19: ...er to avoid false readings 2 Adjust all registers and duct dampers to the desired positionandrunthefurnacefor10to15minutesbefore taking any temperature readings The temperature rise is the difference...

Страница 20: ...ir Limit Switch Note A properly functioning limit switch should turn off the gas valve when the return is blocked time depends on how well the return air is blocked The circulating air and combustion...

Страница 21: ...that they were removed 12 Follow the lighting instructions found on the furnace door to return the furnace to operation Verify proper operation after servicing Cleaning Of Flue Passages If the flue p...

Страница 22: ...of combustion products into the living space can create potentially hazardous conditions including carbon monoxide poisoning that could result in personal injury or death Check the vent pipe and or ch...

Страница 23: ...Right Side 0 In Vent 1 In Back 0 In Top 1 In Front 4 In These are the listed clearances to combustible materials Allow 24 in minimum clearance for servicing Recommended clearance is 36 in The furnace...

Страница 24: ...r N Dimensions shown in Inches Figure 15 SA 80 High Efficiency Upflow Horizontal Furnaces D 23 A 23 28 34 15 1 25 1 X 3 HOLE FOR GAS C 19 B 23 22 21 22 29 22 25 1 X 3 X 45 HOLE FOR GAS 4 KNOCKOUTS BOT...

Страница 25: ...B FRONT BRACE 7 RIGHT SIDE LEFT SIDE BOTTOM VIEW FLANGES TOP VIEW 19 ACCEPTS 4 TYPE B VENT PIPE Figure 16 SK 80 High Efficiency Downflow Furnaces SK Model s Dimension A Dimension B Dimension C Dimensi...

Страница 26: ...685 32 1 645 32 1 590 34 1 550 34 1 485 36 1 415 38 Med High 1 400 38 1 360 39 1 340 40 1 310 41 1 275 42 1 245 43 1 190 45 1 125 47 Med Low 1 235 43 1 215 44 1 180 45 1 155 46 1 130 47 1 100 48 1 060...

Страница 27: ...65 1 175 68 SA108 35C Side Return 108 000 High 2 295 35 2 235 36 2 180 37 2 110 38 2 050 39 1 975 41 1 900 42 1 810 44 Med High 2 130 38 2 075 39 2 035 39 1 970 41 1 915 42 1 845 43 1 765 45 1 675 48...

Страница 28: ...60 43 1 520 44 1 475 45 Med High 1 330 50 1 315 51 1 300 51 1 280 52 1 255 53 1 230 54 1 200 56 1 150 58 Med Low 1 180 56 1 165 57 1 150 58 1 135 59 1 115 60 1 090 61 1 060 63 1 010 66 Low 940 71 925...

Страница 29: ...103 9 0 14 15 126 45D 126 000 24 115 60 1 127 103 15 2 12 30 NOTES can be C or N Time delay fuses or HACR type circuit breakers are required Thermostat Wire Gauge Recommended Thermostat Wire Length 2...

Страница 30: ...K BLACK BLACK BLUE BLUE BLUE BLUE BLUE ORANGE BLUE GREEN BLUE BLACK BLACK WHITE BLACK WHITE WD 710731 C FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE For 80 and 90 Single Stage Furnaces SINGLE STAGE TH...

Страница 31: ...176 353 48 75 375 750 104 35 173 346 50 72 360 720 106 34 170 340 52 69 346 692 108 33 167 333 54 67 333 667 110 33 164 327 56 64 321 643 112 32 161 321 58 62 310 621 114 32 158 316 60 60 300 600 116...

Страница 32: ...HIGH HIGH Table 9 Natural Gas Heating Values Table 8 High Altitude Deration Chart for Propane Gas PROPANE GAS ALTITUDE ABOVE SEA LEVEL INPUT BTU 45 000 54 000 72 000 90 000 108 000 126 000 0 to 1 999...

Страница 33: ...LD PRESSURE 9 000 to 9 999 FT 51 49 49 49 49 49 ORIFICE SIZE 2 6 2 8 2 8 2 8 2 8 2 8 MANIFOLD PRESSURE Table 11 High Altitude Deration Chart for Natural Gas Low Heating Value NATURAL GAS LOW HEATING V...

Страница 34: ...34...

Страница 35: ...OW ML MH HIGH EAC L1 XFMR HUM 24V L1A 5 NEUTRALS 2 6 3 4 1 7 8 9 5 2 6 3 4 1 FAN 8 4 7 3 11 1 9 10 13 12 2 5 6 ITEM COMPONENT NAME 1 Blower Assembly 2 Blower Door Switch 3 Burner Assembly 4 Combustion...

Страница 36: ...esh air supply for combustion and ventilation YES NO Installation Altitude ____________________ FT Deration Percentage ___________________ Furnace Input _______________________ Btuh Supply Air Tempera...

Отзывы: