background image

Fluid Body

1. Remove the two retainer screws.

2. To reinstall the fluid body, align fluid

body holes with diaphragm and air
cylinder body holes and reinsert
retainer screws. Tighten in accor-
dance with the following torque
specifications:

newton 

Fluid body

meters

(inch pounds)

Acetal (black) 

1.58 Nm

(14 inch pounds)

UHMW

*

(yellow)

0.79 Nm

(7 inch pounds)

Stainless steel

1.58 Nm

(14 inch pounds)

*

Ultra High Molecular Weight

Diaphragm

3. Back-out stroke control knob two

turns counterclockwise from the
closed position.

4. Remove fluid body.

5. Unscrew diaphragm (counter-

clockwise) and remove it from 
the piston rod.

6. Thread-on the new diaphragm

and tighten with medium pressure.

7.  Align the holes of the diaphragm

with the appropriate holes in the
air cylinder body by inserting a
flat tip screwdriver through the
hole in the stroke control knob
and engage piston rod slot.

8.  Rotate rod, piston and diaphragm

assembly clockwise until holes
are aligned.

9. Reinstall fluid body.

10. Turn stroke control knob clock-

wise until closed, and then
reopen to approximate stroke.

1

2

4

5

6

7

9

11

Valve Disassembly and
Reassembly Procedures

CAUTION: To prevent damage, the valve
must be disassembled starting at the fluid
outlet end of the valve. 

Diaphragm
UHMW

Fluid body 

Tip Adapter 

Fluid inlet fitting

(2) Retainer 
screws
#7524

Fluid body 

Tip 
Adapter 

Fluid inlet fitting

751V assembly

www.efd-inc.com   [email protected]

USA 800-556-3484   44 (0) 1582 666334   Asia +86 (21) 5854 2345 

Sales and service of EFD dispensing systems are available worldwide.

Отзывы: