background image

POWER

RUN

SETUP

CYCLE

Test

Clear

Purge

Run

Setup

Program

Fast

Slow

Time Set

Steady

Fast

Slow

Time Set

STOP

Pressure

Time

®

A NORDSON COMPANY

To pressurize

To exhaust

Installation

Set desired deposit size by adjusting valve open
time. Refer to valve controller operating manual.

9

1.

Mount valve with an EFD universal valve
mount (#7002VM) or other fixture.

2.

Connect the fluid feed hose to the fluid
inlet fitting (#72608P is installed for use
with 3/8” OD tubing and reservoir.

3.

Connect valve control air hose to
ValveMate

controller (or other pneumatic

switch) used to control valve open time.

4.

Install nozzle to the valve output.

5.

Fill reservoir by pouring fluid directly into
tank liner or manufacturer’s bottle
placed inside reservoir.  Secure cover
prior to setting pressure.

6.

Set reservoir pressure, to low for thin
fluids and higher for thick fluids.

7.

Place a cup under the dispensing tip
or nozzle and actuate the valve until
fluid lines, valve and dispensing tip are
free of air.

8.

Set desired flow rate by adjusting fluid
reservoir or changing dispensing tip or
nozzle. 

9.

Set desired deposit size by adjusting
valve open time. Refer to valve controller
operating manual.

7

 Air Output

ut

 Exhaust

r

Prior to installing this valve, please
read the associated reservoir and
valve controller operating instructions
to become familiar with the operation
of all components of the dispensing
system.

1

6

4

2

5

3

8

Отзывы: