
19
GB
Warning: If the requirements for ventilation are
NOT complied with, the cooling airflow around
the product will be considerably reduced and
the product can overheat.
This can cause a fire.
3. Distance to combustible material
Firewall
Ensure that the safety distances are fulfilled.
(FIG 1).
When connecting a steel chimney to the top outlet use
the security distances required by the manufacturer.
The insert expands when in use, and for this
reason the surround must NEVER rest on the
insert, but have a gap of about 3 mm. The
insert must neither rest on the bench plate
or against the sides. It is recommended to
dry stack the surround in order to adjust the
insert prior to perforating the chimney for the
flue connection.
4. Assembly
Removing the insert from the pallet
Before the insert is removed from the pallet, remove the
accessories in the combustion chamber. To acess the
combustion chamber, do as follows:
1. Loosen the transport safety from the counterweight
and loosen the screw fastening the transport safety to
the product. Push the transport safety away from the
counterweight FIG 3a
2. Make sure both wires are in place before opening the
door FIG 3B
3. Remove alle loose accessories from the combustion
chamber. Use the list of contents to make sure all parts
are included. Before lifting the product of the pallet,
secure the counterweight with the transport safety.
Operational control
When the insert is in an upright position,
and prior to
mounting the surround
, check that all
functions are easy to use and appear satisfactory.
Important! When placing the insert on
a combustible foor, a steel plate of at least 0.7mm
must cover the entire foor surface inside
the surround. Any fooring made of combustible
material, such as linoleum, carpets etc. must be
removed from underneath the steel plate.
1. Adjust the legs. Make sure the insert is level
2. Loosen the transport safety. Make sure the
wires holding the door are in place.
3. Make sure the door can be opened and closed
properly.
Attention! The pulleys on each side of the door are
coated with special heatresistant grease. If a new
grease is needed, contact one of our dealers to
make sure the right type of grease is used.
Pulley radiation shield FIG 8
If the insert is connected to the smokepipe
sideways, attach the small radiation shield around the
pulley closest to the smokepipe.
Ignition
Air vent control
A
B
Air vent control
Ignition position
Left position = closed
Right position = open
Fully to the right
Self-closing door FIG4
To make the door self closing, do as follows;
Loosen the screws and remove the two weights with
handle. Position the enclosed panel section on the
counterweight and tighten the screws.
Check the function, note that during lighting
the selfclosing effect increases.
Cleaning the glass FIG 5A-B
If it becomes necessary to clean the glass, pull out the
two small handles above the door to keep it in place
FIG 5A. Pull out the lock handle on the left side of the
door and open the door. After cleaning the glass, first
lock the handle on the left side of the door before push-
ing the two small handles back in place.
Caution!! Be careful when opening the door
sideways. Some surronds have marble/waxed
concrete parts and grates quite close to the door
and both the door and surrounding parts may
sustain damage if carelessly operated.
When opening the door sideways for cleaning the
glass, make sure not to apply additional pressure
to the hinges.
Содержание Q-34AL - Powerstone
Страница 50: ...50 Q 34AL mm 717 753 630 698 522 157 638 100 80 100 920 940 2 169 1091 1111 414 385 384 394 3 5 4...
Страница 54: ...54 550 600cm 2 600cm 2 600cm2 600cm 2 15 750 max 100 15 FIG 1c...
Страница 55: ...55 FIG 2 FIG 3 10 mm A B B...
Страница 56: ...56 10 mm FIG 4 A B FIG 4b 10 mm...
Страница 57: ...57 FIG 5b FIG 5 A B B...
Страница 59: ...59 90o FIG 6c FIG 7...
Страница 60: ...60 FIG 7b FIG 7c...
Страница 61: ...61 FIG 7d FIG 7e...
Страница 62: ...62 FIG 9 A B C D E F G H FIG 8 1 0 10 VA NA DIU M No 7 C H R O M E 8 mm...
Страница 63: ...63 FIG 10 FIG 10b...
Страница 64: ...64 FIG 11 FIG 12...
Страница 65: ...65 FIG 13 FIG 14...
Страница 66: ...66 FIG 15 FIG 16...
Страница 67: ...67 FIG 17 FIG 18...
Страница 71: ...A A B C D E F G 2015 1186 kW ENERGIA ENERGIJA ENERGY ENERGIE A A A A A A Nordpeis AS Q 34AL L R Nordpeis 7 0 71...
Страница 72: ...72 Nordpeis AS Gjellebekkstubben 11 N 3420 LIERSKOGEN Norway www nordpeis no 811234 IAV Q34AL...