![Nordmann Engineering SPA Display Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/nordmann-engineering/spa-display/spa-display_installation-and-operation-manual_1703699018.webp)
18
2. Free the shielding of the CAN BUS cable(s) (shielded four-wire cable, 0.34 mm
2
per wire) by removing
the insulation from the appropriate clamping position to the end of the cable. Remove the exposed
shielding to about 2 cm, then fix the end of the remaining shielding with a piece of shrink tubing as
shown in
and secure the exposed shielding with the shielding clamp(s) to the housing.
In-wall cable routing
On-wall cable routing
Stripped-down shielding
shrinkable tubing
Cable wires
Fig. 15: Fixing the exposed shielding of the CAN BUS cable(s) to the housing with the shielding
clamp(s)
Содержание SPA Display
Страница 1: ...INSTALLATION AND OPERATION MANUAL Nordmann SPA Display 2591871 A EN 1903...
Страница 32: ...Notes...
Страница 33: ...Notes...
Страница 34: ...Notes...
Страница 35: ......