background image

 

 

Page  3 

YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER

Thank you for purchasing our shelter. When properly assembled and maintained, this product will 

provide years of reliable service. These instructions include helpful hints and important information 

needed to safely assemble and properly maintain the shelter. Please read these instructions

 before

 you 

begin. 

If you have any questions during the assembly, please contact local dealer for assistance. 

 

SAFETY PRECAUTIONS 

. Wear eye protection. 

. Wear head protection

 

. Wear gloves when handling metal tubes 

. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords. 

. Do not climb on the shelter or framing during or after construction. 

. Do not occupy the shelter during high winds, tornadoes, or hurricanes. 

. Provide adequate ventilation if the structure is enclosed. 

. Do not store hazardous materials in the shelter. 

. Provide proper ingress and egress to prevent entrapment. 
 

ANCHORING INSTRUCTIONS 

Prior to assembling this shelter, please read the

 MUST READ 

document included with the shipment. 

      WARNING:

 The anchor assembly is an integral part of the shelter construction. Improper anchoring 

may cause shelter instability and failure of the structure. Failing to anchor the shelter properly 

will void 

the manufacturer’s warranty

 and may cause serious injury and damage. 

 

LOCATION 

Choosing the proper location is an important step before you begin to assemble the structure. 

The following suggestions and precautions will help you determine whether your selected location is the 

best location. 

. Never erect the structure under power lines.   

. Identify whether underground cables and pipes are present

 before

 preparing the site or anchoring    the 

structure. 

. Location should be away from structures that could cause snow to drift on or around the building 

. Do not position the shelter where large loads such as snow and ice, large tree branches, or other 

overhead obstacles could fall. 

 

SITE 

After choosing a location, proper preparation of the site is essential. The following site characteristics will 

help ensure the integrity of the structure. 

. The support structure must be level to properly and safely erect and anchor the frame. 

. Drainage: Water draining off the structure and from areas surrounding the site should drain away from 

the site to prevent damage to the site, the structure, and contents of the structure. 

     

WARNING:

 The individuals assembling this structure are responsible for designing and furnishing all 

temporary bracing, shoring and support needed during the assembly process. For safety reasons, those 

who  are  not  familiar  with  recognized  construction  methods  and  techniques

  must  seek  the  help  of  a 

qualified contractor.         

 
 

Содержание SST304716

Страница 1: ...Page 1 Double Truss Shelter Model SST304716 W9 14xL14 2xH4 88m Assembly Instructions ...

Страница 2: ...Page 2 RECOMMENDED TOOLS Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment ...

Страница 3: ...chor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cab...

Страница 4: ...or back end left 1 A 2C Upper Truss Arch for back end right 1 A 3 Shoulder Bent Truss Arch for middle 12 A 3A Shoulder Bent Truss Arch for front and back end with connection plate 4 A 4 Purlin between Arch No 1 2 11 B 4A Purlin between Arch No 2 to 6 55 B 4B Purlin between Arch No 6 7 11 B 5 Bracing Tube 12 B 6 Base Plate for four corners 4 A 7 Base Plate for middle 12 A 8 Tensioning Tube for Roof...

Страница 5: ...Cover 1 bundle A 16 Cable Tie for Roof Cover 70 A 17 Belt for winch No 14 16 A 18 Stake Peg normal conditions 48 A 18A Earth Auger with its tool normal conditions 16 A 18B Expansion Bolt concrete ground 64 B Back End Panel 19 Portal for back end 2pcs set 2 sets B 20 Short Vertical Bar for back end 1 B 21 Door Cross Beam for back end 2pcs set 1 set B 22 Rail for back end 4 B 23 Back Cover 1 B 23A T...

Страница 6: ...d Panel 30 Portal for front end right 2pcs set 1 set A 30A Portal for front end left 2pcs set 1 set A 31 Portal for front end 1 A 32 Rail for front end 2pcs set 1 set B 33 Rail for front end 4 B 34 Front Cover with door cover 1 B 35 Door Bolt 2 B 36 Connection Plate for portal No 30 30A 4 A 37 Winch with bolt for front door 1 set A 38 Tube in door cover 2pcs set 6 sets B 39 Bolt M8x120 for square ...

Страница 7: ... with its tool normal conditions 2 A 43B Expansion Bolt concrete ground 8 B 44 Steel Wire for front door 1 bundle B 44A Steel Wire rope clip for front door 4 B 45 Door Track for front door 2pcs set 2 sets B 46 Bracket for Winch No 37 1 A 47 Self drilling bolt and its tool for door track No 45 28 4 B 48 Tape for door tube No 23A 38 1 B ...

Страница 8: ...of base plates The measurement is from center to center of plates Referring to the diagram and confirm the place of base plates ENSURE THAT THE FOUNDATION IS SQUARE 1 The Stake Peg No 18 and Earth Auger No 18A applies for normal ground and grassland 2 The Expansion Bolt No 18B applies for concrete and hard ground ...

Страница 9: ...Page 9 Figure 1 ...

Страница 10: ...h No 1 to 8 1 Find Truss Arches for front end No 1A 2B 3A and Base Plate No 6 for Arch No 1 and connect them by Bolt M8x60 No 12 2 Find relative parts of rails and portals for front end and assemble them referring to Figure 2 Figure 2 ...

Страница 11: ...Page 11 3 Find Truss Arches No 1 2 3 for Arch No 2 to 7 and connect them by Bolt M8x60 No 12 Please refer to Figure 3 for details Figure 3 ...

Страница 12: ... Truss Arches for front end No 1A 2A 3A and Base Plate No 6 for Arch No 8 and connect them by Bolt M8x60 No 12 5 Find relative parts of rails and portals for back end and assemble them referring to Figure 4 Figure 4 ...

Страница 13: ...install Purlin No 4 Connect purlins by Bolt M8x50 No 13A and connect them to arch by Bolt M8x100 No 13 and then go to Arch No 3 to No 7 and Purlins No 4A 4B one arch and purlin tubes in turns Please refer to Figure 5 and Figure 6 8 Install Bracing Tube No 5 between arches by Tube Clip No 10 Figure 5 ...

Страница 14: ...Page 14 Figure 6 ...

Страница 15: ...quare and evenly centered on the frame Note The end flaps must overhang evenly at both ends 3 Use Cable Tie No 16 to fix roof cover to end arches first Then use the supplied Knitting Rope No 15 to tighten the roof cover to the end arches The rope should be cut as your requirements when using The recommended procedure is to use separate pieces of rope and start by first lacing the cover from the bo...

Страница 16: ...Page 16 ROOF COVER INSTALLATION Figure 7 ...

Страница 17: ...Page 17 FRONT COVER AND MECHANICAL DOOR INSTALLATION Figure 8 ...

Страница 18: ...Page 18 MECHANICAL DOOR INSTALLATION Figure 9 ...

Страница 19: ...Page 19 BACK COVER AND PULL EASE ROLL UP DOOR INSTALLATION Now your assembly is completed Figure 10 ...

Отзывы: