A
A
A
B
D
C
ENGLISH
- if present, remove the cast-iron rings and/or the sheet-metal
perforated panels
A
from the outlets where the air ducting pipes
are to be connected;
- secure the supplied galvanised fittings
B
to the product cover, at
the outputs to be channelled;
- secure the ducting pipes
C
to the galvanised fittings
B
using the
supplied hose clamps
D
;
- in the case of channelling a product with
four upper outputs
, it
is advisable to
use the front ones
(see example
A
in the figure)
where most of the heat accumulates;
- bend the two ends of the galvanized support brackets 90°,
where the motor unit of the Wind Air kit will be fixed;
If the product is supplied with CARTER CLOSED ON THE
BOTTOM SIDE
Remove ALL the knockouts located on the bottom side
of the carter to facilitate the air circulation.
24
Содержание WIND AIR
Страница 2: ...ITALIANO 3 ENGLISH 19 DEUTSCH 35 FRANCAIS 51 ESPAÑOL 67 2 ...
Страница 83: ......