001200MAN-09
The R/RH-Series Startup Record located in this manual is used in conjunction with this startup procedure to provide a detailed
record of the installation. A completed copy should be left on site, a copy kept on file by the installer and a copy should be sent to
Maritime Geothermal Ltd.
Check the boxes or fill in the data as each step is completed. For data boxes, circle the appropriate units.
Pre-Start Inspection
Ductwork:
1.
Verify that all ductwork has been completed and is firmly attached to the unit. Verify that any dampers or diverters are
properly set for operation of the heat pump.
2.
Verify that all registers are open and clear of any objects that would restrict the airflow.
3.
Verify that a new air filter is installed and the cover is secured.
4.
Verify the condensate drain is connected, properly vented and free of debris.
5.
If a plenum heater has been installed, verify that it is securely fastened to the ductwork.
Outdoor Loop (Ground Loop):
1.
Verify that all shutoff valves are fully open and there are no restrictions in the piping from the heat pump to the ground loop,
and that full flow is available to the heat pump.
2.
Verify that the entire system has been flooded and all the air has been purged as much as possible.
Further purging may
be required after the system has been operating for a while.
3.
Verify that the loop contains the proper mix of antifreeze for the intended application. Record the type of antifreeze and the
mixture value on the startup sheet; circle % Vol. or % Weight.
4.
Record the static loop pressure on the startup sheet.
Outdoor Loop (Open Loop):
1.
Verify there are no leaks in the connections to the unit. Verify the water valve is installed and properly oriented in the
water out line.
2.
Verify that there is flow control in water out line.
Domestic Hot Water (Desuperheater):
1.
Verify that all shutoff valves are fully open and there are no restrictions in the piping from the heat pump to the domestic
hot water tank.
2.
Verify that the entire system has been flooded and all the air has been purged as much as possible. Further purging may
be required after the system has been operating for a while.
3.
Verify that the brown wire with the insulated terminal is disconnected in the electrical box. Refer to the schematic diagram
for more information.
Electrical:
1. Ensure the power to the unit is off. Ensure the power to the plenum heater is off if equipped.
2.
Verify all high voltage connections. Ensure that there are no stray wire strands, all connections are tight and the ground
wire is connected tightly to the ground connector for the heat pump and plenum heater.
3.
Record the fuse / circuit breaker size and wire gauge for the heat pump. Record the fuse / circuit breaker size, wire gauge
and size of the plenum heater if installed.
4.
Verify that the control connections to the thermostat and plenum heater (if installed) are properly connected and all control
signals are off, so that the unit will not start up when the power is turned on.
5.
Ensure all access panels except the lower one that provides access to the electrical box are in place.
Startup Procedure
Содержание R-45
Страница 11: ...1 Nov 2021 Page 11 001200MAN 09...
Страница 15: ...1 Nov 2021 Page 15 001200MAN 09...
Страница 16: ...1 Nov 2021 Page 16 001200MAN 09...
Страница 18: ...1 Nov 2021 Page 18 001200MAN 09...
Страница 19: ...1 Nov 2021 Page 19 001200MAN 09...
Страница 21: ...1 Nov 2021 Page 21 001200MAN 09...
Страница 25: ...1 Nov 2021 Page 25 001200MAN 09...
Страница 26: ...1 Nov 2021 Page 26 001200MAN 09...
Страница 27: ...1 Nov 2021 Page 27 001200MAN 09...
Страница 28: ...1 Nov 2021 Page 28 001200MAN 09...
Страница 29: ...1 Nov 2021 Page 29 001200MAN 09...
Страница 33: ...1 Nov 2021 Page 33 001200MAN 09...
Страница 34: ...1 Nov 2021 Page 34 001200MAN 09...
Страница 35: ...1 Nov 2021 Page 35 001200MAN 09...
Страница 63: ...1 Nov 2021 Page 63 001200MAN 09 Wiring Diagram 208 230 1 60...
Страница 64: ...1 Nov 2021 Page 64 001200MAN 09 Electrical Box Layout R 45 75 208 230 1 60...
Страница 65: ...1 Nov 2021 Page 65 001200MAN 09 Electrical Box Layout R 80 208 230 1 60...
Страница 66: ...1 Nov 2021 Page 66 001200MAN 09 Electrical Box Layout RH 45 75 208 230 1 60...
Страница 67: ...1 Nov 2021 Page 67 001200MAN 09 Wiring Diagram 208 3 60...
Страница 68: ...1 Nov 2021 Page 68 001200MAN 09 Electrical Box Layout R 45 75 208 3 60...
Страница 69: ...1 Nov 2021 Page 69 001200MAN 09 Electrical Box Layout R 80 208 3 60...
Страница 70: ...1 Nov 2021 Page 70 001200MAN 09 Electrical Box Layout RH 45 75 208 3 60...
Страница 71: ...1 Nov 2021 Page 71 001200MAN 09 Wiring Diagram 265 277 1 60...
Страница 72: ...1 Nov 2021 Page 72 001200MAN 09 Electrical Box Layout R 45 75 265 277 1 60...
Страница 73: ...1 Nov 2021 Page 73 001200MAN 09 Electrical Box Layout R 80 265 277 1 60...
Страница 74: ...1 Nov 2021 Page 74 001200MAN 09 Electrical Box Layout RH 45 75 265 277 1 60...
Страница 75: ...1 Nov 2021 Page 75 001200MAN 09 Wiring Diagram 460 3 60...
Страница 76: ...1 Nov 2021 Page 76 001200MAN 09 Electrical Box Layout R 25 75 460 3 60...
Страница 77: ...1 Nov 2021 Page 77 001200MAN 09 Electrical Box Layout R 80 460 3 60...
Страница 78: ...1 Nov 2021 Page 78 001200MAN 09 Electrical Box Layout RH 25 75 460 3 60...
Страница 79: ...1 Nov 2021 Page 79 001200MAN 09...
Страница 80: ...1 Nov 2021 Page 80 001200MAN 09...
Страница 81: ...1 Nov 2021 Page 81 001200MAN 09 Dimensions R 45 Left Return...
Страница 82: ...1 Nov 2021 Page 82 001200MAN 09 Dimensions R 45 Right Return...
Страница 83: ...1 Nov 2021 Page 83 001200MAN 09 Dimensions R 55 65 75 Left Return...
Страница 84: ...1 Nov 2021 Page 84 001200MAN 09 Dimensions R 55 65 75 Right Return...
Страница 85: ...1 Nov 2021 Page 85 001200MAN 09 Dimensions R 80 Left Return...
Страница 86: ...1 Nov 2021 Page 86 001200MAN 09 Dimensions R 80 Right Return...
Страница 87: ...1 Nov 2021 Page 87 001200MAN 09 Dimensions RH 45 Left Return...
Страница 88: ...1 Nov 2021 Page 88 001200MAN 09 Dimensions RH 45 Right Return...
Страница 89: ...1 Nov 2021 Page 89 001200MAN 09 Dimensions RH 55 65 75 Left Return...
Страница 90: ...1 Nov 2021 Page 90 001200MAN 09 Dimensions RH 55 65 75 Right Return...