4. Commissioning
-24- B1050-GB-0213
www.nord.com
4.8 Checklist
Checklist
Object of the check
Checked on:
Information –
see Section
Is the vent screw screwed in?
Sec. 3.3
Does the required configuration conform with the actual installation?
Sec. 6.1
Are the external gear shaft forces within permitted limits (chain tension)?
Sec. 3.5
Is the torque support correctly fitted?
Sec. 3.6
Are contact guards fitted to rotating components?
Sec. 3.8
Is the cooling system connected?
Sec. 3.14/4.3
Is a grease-filled gap visible with Taconite seals?
Sec. 4.5
Has the pressure safeguard been functionally connected?
Sec. 4.7