![background image](http://html.mh-extra.com/html/nokia/7368-isam-ont-g-240w-c/7368-isam-ont-g-240w-c_product-manual_255306065.webp)
7368 ISAM ONT G-240W-C Product Guide
Replace a G-240W-C indoor ONT
Issue: 01
Edition 01
65
10
Connect the fiber optic cable with SC/APC adapter into the SC/APC connector. Figure
shows the location of the SC/APC connector.
11
Install the power supply according to manufacturer specifications.
12
Connect the power cable to the power connector.
13
Power up the unit by using the power switch.
14
If used, enable the Wi-Fi service by pressing the WLAN button; see Figure
for the location
of the WLAN button.
15
If used, configure the SLID; see the
7368 ISAM ONT Configuration, Management, and
Troubleshooting Guide
for more information.
16
Verify the ONT LEDs, voltage status, and optical signal levels; see the
7368 Hardware and
Cabling Installation Guide
.
17
Activate and test the services; see the
7368 Hardware and Cabling Installation Guide
.
Danger —
Fiber cables transmit invisible laser light. To avoid eye
damage or blindness, never look directly into fibers, connectors, or
adapters.
Warning —
Be careful to maintain a bend radius of no less than 1.5 in.
(3.8 cm) when connecting the fiber optic cable. Too small of a bend radius
in the cable can result in damage to the optic fiber.
Note —
Fiber cable preparation varies depending on the type and size
of the inside or outside plant fiber cable being spliced to the SC/APC fiber
optic pigtail cable.
Note —
Observe the following:
•
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 VDC, 3 A.
Note —
A new SLID or the old SLID may be used with the replacement
ONT. If a new SLID is used, the new SLID must also be programmed at
the P-OLT using TL1 or a network manager. If the old SLID is used, no
changes need to be made at the P-OLT; see the operations and
maintenance documentation for the OLT for more details.
R05.05.01 | December 2016 | 3FE 46690 AAAA TCZZA | Edition 01