7368 ISAM CPE A-240Z-A Product Guide
Install an A-240Z-A CPE
Issue: 01
3FE-46615-AAAA-TCZZA
51
6.6 Procedure
Use this procedure to install an A-240Z-A CPE.
1
Place the CPE unit on a flat surface, such as a desk or shelf.
Note —
The A-240Z-A cannot be stacked with another CPE or with
other equipment. The CPE mounting requirements are:
•
allow a minimum 100 mm clearance above the top cover
•
allow a minimum 50 mm clearance from the side vents
•
do not place any heat source directly above the top cover or below the
bottom cover
2
Review the connection locations as shown in Figures
13
.
Figure 13
A-240Z-A CPE connections
ON/OFF TEL1
TEL2
WAN LAN1 LAN2 LAN3 LAN4
USB
USB
UPS
LED
POWER
ON/OFF
button
TEL1 and TEL2
POTS ports
(RJ-11)
WAN port
(RJ-45)
LAN ports (4)
(RJ-45)
USB 2.0
ports (2)
Power supply
connector
LED on/off
button
Power
connector
Reset
button
26018
3
Connect the Ethernet cables to the RJ-45 ports; see Figure
13
for the location of the RJ-45
ports.
4
Connect the WAN cable to the RJ-45 WAN port; see Figure
13
for the location of the RJ-45
WAN port.
5
Route the POTS cables directly to the RJ-11 ports as per local practices.
The POTS port to the left is labeled TEL1 for Line 1 while the port on the right is labeled TEL2
for Line 2, as shown in Figure
13
.
6
Connect the power cable to the power connector.
All manuals and user guides at all-guides.com