
nokia
C
ONNECTING
P
EOPLE
PAGE 14 (24)
NMP/CMO Sales and Marketing
Approved 1.0
Customer Care EMEA
DJk
Technical Services, Repair Concepts
Confidential
03.03.2004
Service Manual 7200 Level 1&2
Copyright 2003-2004 © Nokia Corporation
Put the new Domesheet onto the Domesheet Assembly
Jig. Mind the guiding pins.
Remove the protection film. Tweezers can be used for
retaining the Domesheet.
Arrows point to the right assembly position and put
the UI PWB Module onto the Domesheet Assembly Jig
carefully.
Press on PWB Module after checking that all guiding
pins are positioned correctly.
Finally check that the holes of Domesheet are centered
to the UI PWB module holes. Ensure also, that there are
no bubbles in Domesheet film.
Remove the protection film from UI PWB Module.