OPERATION
Speed Scrub 2401/2601 (06--06)
17
7. After charging, check the electrolyte level (A)
again. The level should be approximately
0.38 in / 1 cm from the bottom of the fill--port (B)
(Figure 31). Add distilled water if needed.
DO NOT OVERFILL.
A
B
FIG. 31
MACHINE MAINTENANCE
To keep the machine in good working condition, simply
follow the daily, monthly and quarterly maintenance
procedures.
WARNING: Electrical Hazard. Disconnect
Battery Cables Before Servicing Machine.
DAILY MAINTENANCE
(After Every Use)
1. Remove and clean pads/brushes. Never use
soiled pads when cleaning. Replace pads when
they become loaded with residue.
2. Remove and clean lint from float shut--off screen
located in recovery tank (Figure 32).
FIG. 32
3. Drain and rinse tanks thoroughly. After draining
tanks, hinge recovery tank until you can see
vacuum intake hole at rear of tank. Remove any
debris in hole if necessary.
4. FaST Model Only: When FaST--PAK carton is not
installed on machine, make sure the supply hose
is connected the hose storing plug. This will
prevent the FaST solution system from drying out
and clogging up (Figure 33). If any dried
concentrate is visible on the FaST--PAK connector
or supply hose connector, soak in warm water to
remove.
FIG. 33
5. Raise squeegee and wipe it off with a dry cloth.
Store squeegee in the up position to prevent
squeegee damage.
6. Clean the machine with an all purpose cleaner and
damp cloth (Figure 34).
FOR SAFETY: When cleaning machine, do not
power spray or hose off machine. Electrical
malfunction may occur.
FIG. 34
7. Recharge the batteries after a total of 30 minutes
of use or more (See CHARGING BATTERIES).