![Nobel RO 809 /E Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/nobel/ro-809-e/ro-809-e_instruction-manual_1697747004.webp)
REVERSE OSMOSIS SYSTEMS RO 809-812-815/E - INSTRUCTIONS MANUAL
s.r.l.Milano - ITALY
Page 4 of 25
ro809-812-815_mi-r0.doc
- r. 0
1. Safety
1.1. General
The equipment has been designed and constructed according to D.P.R. n° 459 of 24th July
1996 (regulation for accomplishment of Norms 89/392/CEE, 91/368/CEE, 93/44/CEE and
93/68/CEE regarding the unification of States members laws in so far as machines are
concerned).
It has been designed and constructed according to European Norms UNI EN 292-1, UNI EN
292-2, UNI EN 292-2/A1, UNI EN 418, CEI EN 60439-1,
CEI EN 60 204-1.
Only authorized and skilled personnel will be allowed to carry out installation, start up as well
as routine and planned maintenance.
1.2. How to displace the unit
Particular care and attention should be put in during moving and displacing of heavy items, in
order to avoid injuries to persons or damage properties. The heavy components must be lifted
and displaced by lifting or hooking them up only by the points and facilities shown on the
attached drawings. It is strictly recommended to use only proper sized and suitable ropes,
chains or hooks (see DIMENSIONS & WEIGHT).
1.3. Hydraulics
All operations must be performed by and/or under direct supervision of skilled and
authorized operators, using proper tools and personal protection devices if required
(CE marked), according to safety regulations for working areas. The operators must
be aware of the hazards and danger of the chemicals used in the process.
In case of leakage of chemicals and/or in case of accident (contact with skin, eyes,
etc.) follow strictly the directions mentioned on the safety bulletins of the chemicals
themselves. Before any operation of taking out pipes or part of hydraulic system, it is
required to release the pressure inside and empty the part of the system.
1.4. Electrical
Before starting any operation on electrical devices, be sure that main power supply is
OFF. All operations must be performed by skilled and authorized operators, using
proper tools and personal protection devices if required (CE marked), according to
safety regulations for working areas.
In case of liquid leakage, switch off the main power supply before operation. Before
the switching ON, be sure all the parts of the system are perfectly dry. Check that the
available electrical power is correct, as shown on technical data
Do not make preliminary wiring connections.
1.5. Directions for storage, delivery, installation
t = ºC
t = ºF
humidity rel.
notes
•
closed rooms
5÷40
41÷104
5÷95%
without condensate
•
open space
5÷40
41÷104
5÷95%
without condensate
protect from sun-light and rain.
•
transport
5÷40
41÷104
5÷95%
without condensate
protect from sun-light and rain.
•
installation
5÷40
41÷104
5÷95%
without condensate
protect from sun-light and rain.