
- 24 –
TL25 User guide–- 33-60-021-000
3.6 Connecting the Topline bus and the NMEA connection
1.
Make the bus cable run from the TL25 to the TOPLINE terminal box of your installation.
2.
Connect the bus cable inside the terminal box.
If you reduce the length of the bus cable, strip and galvanise the wires before connecting them
inside the terminal box.
3.7 Identification of the cable wires
White cable 6 wires
Wire identification
White wire
+12V
TOPLINE Bus
Black wire
Topline Data
Braid
GND
Red wire
Initialisation wire (GND)
Yellow wire
NMEA +
NMEA Input
Green wire
NMEA –
B
L
A
N
C
G
N
D
N
O
IR
B
L
A
N
C
G
N
D
N
O
IR
1
2
V
G
N
D
N
M
E
A
-
N
M
E
A
+
N
M
E
A
-
N
M
E
A
+
in
it
ASupply 12Vdc
Connecting box
90-60-417
-
GND
DATA black
12VDC white
Figure 13 : connection of the TOPLINE bus
input NMEA
+
Initialisation wire
nke
TL 25
16.85
BOAT SPEED
APP WIND A
105
274°
COMPAS HEAD
NOEUDS
DEGREES
DEGREES