TRANSIMITTER
35
CONVERT PARTS
TM
Http: // www.flowmeter.cc
CONVERT
Ⅷ
I
. Transportation, storage
In order to avoid transport and storage of the occurrence of unnecessary damage, in
the process of transport and storage of the following items should be noted that
1) In order to prevent the functioning of the process of instrument in damage and
lost, before arrival at the installation site, please keep the packaging when the
company shipped state.
2) To be handled carefully during transportation to avoid brutal to loading and
unloading.
3) Arrived at the scene should be carefully unloaded, in accordance with the
contents of each item packing list check, if missing or not in conformity for those
issues, pls contact with the company.
4) Instrument storage sites must meet the following requirements for indoor
a) drying, ventilation and avoid erosion of corrosive gas
b) a small mechanical vibration to avoid the impact to flowmeter.
c) Environment temperature range. -20 ~ 60°C
d)The humidity should be small than 80%;
5) If instrument doesn’t use for a longer term, Pls keep good protection as the
factory instrumentation.
Ⅷ
、
O r d e r
F
lo
w
ra
ng
e
(m³/h)
L
C
B
T
a
1
2
3
4
5
A
B
J
V
F
G
1
2
3
1
2
3
A
B
D
L: 316L
C: Hc
B: Hb
T: Ti
a: Ta
1:Chloroprene
rubber
2:PTFE
3:Polyurethane
4: F46
5: PFA
Protection class
Output signal
1.IP65
2.IP67
3.IP68
1.≤80°C
1.≤120°C
2.≤150°C
1. 4~20mA
2. Hart
3.Frequency
4. Pulse
5. RS485
Power
A: AC220V
B:Battery
D: DC24V
MF7100
J
L
1
2
1
3
D
10
25
DN:10~1400
KF700-
KF700
①
②
{
Installation
A: Compact type
B: Remote type
(MF7100*
MF7200)
{
Sensor
type
sensor diameter
JA: ClampingType
VA: Threaded
FA: Flange type
KA: Card dwelling size
GA: High-pressure-type
{
{
{
{
{
{
③
④
⑤
⑥
⑦
⑧
⑨
⑩
sample
order
(MF7300)
1
2
3
4
5
Electric
node
material
lining
materials
Working
Temperature
Содержание Flowtech MF710
Страница 39: ......
Страница 40: ...37 TM...