background image

 
 
 

Last update  23.10.2012 

 
 

82 

NOTES:

 

 

Содержание INSTINCT NS230 CL

Страница 1: ...ASSEMBLY AND MAINTENANCE MANUAL NS230 HL CL...

Страница 2: ...10 Engine 11 Propeller 11 Rescue parachute system 12 Battery 12 Ignition system 12 Output 16 8 V 12 Electric schema 13 Dimensions 14 Operating limitations 15 Speed Driving unit limitations Weight Perf...

Страница 3: ...g 32 Engine tuning and maintenance 32 Running in 32 Fuel and oils 33 Carburettor settings 33 Reduction belt tensioning 34 Propeller orientation setting 34 Propeller maintenance 34 Charging the battery...

Страница 4: ...sumption When Choosing the direction and height of your flight always consider possibility of emergency landing Always fly with reserve of speed particularly during all start and landing manoeuvres Do...

Страница 5: ...hese changes will be published in bulletins e g in Pilot magazine Each owner of MPG must take an appropriate action and implement this change and make record of this in the relevant part of this handb...

Страница 6: ...ials performance and characteristics with the UL 2 directive and belongs to the group Powered Paraglider PPG The name PPG type This MPG was awarded airworthiness certificate type Z prototype unique co...

Страница 7: ...o date placed evidential mark OK Change of owner Name Address ID number From To date placed evidential mark OK Canopy manufacturer type category work number date of manufacture min max flight weight c...

Страница 8: ...ight manufacturer type category registration number date of manufacture min max flight weight canopy weight Change of owner Name Address ID number From To date registration mark OK Canopy manufacturer...

Страница 9: ...ess LEXX R Nirvana systems s r o Year of manuf Propeller PULSE Nirvana systems s r o Manuf number Engine NS 230 Simonini Nirvana Name Undercarriage INSTINCT NS 230 Nirvana systems s r o Manufacturer T...

Страница 10: ...de of laminate part Ignition on up off down Ignition switch With left hand thumb press and hold the button on the throttle Cruise control With the right hand thumb press the button on the side of the...

Страница 11: ...st with silencer cylinder capacity 230 ccm power on take off 33 PS empty engine weight 10 5 kg weight incl equipment 13 1 kg fuel type oct rating BA 95 consumption approx 3 5 4 5 l h oil type 100 full...

Страница 12: ...lternator high voltage induction coil and Nirvana control unit It consists of the regulator for charging the start relay the start stop system and a unit for validating the motor parameters It enables...

Страница 13: ...Last update 23 10 2012 13 ELECTRIC SCHEMA ELECTRIC DIAGRAM INSTINCT MADE AFTER 1 1 2011...

Страница 14: ...Last update 23 10 2012 14 DIMENSIONS D D1 L H T T1 1300 1380 530 920 400 480 L T H D D1 T1...

Страница 15: ...lot weight 75 kg Max pilot weight 115 kg Max weight in flight MPG 150 kg Empty weight MPG 27 kg Performance Static thrust propeller 1 3 m 750 N Climb ratio approx 2 5 m s Service ceiling 4 000 m Fligh...

Страница 16: ...oose suitable area for your landing and land as described above Fire switch off the ignition do not try to start the engine Vibrations if abnormal vibrations appear it is necessary to set engine revol...

Страница 17: ...of all paramotor set must be done before the first flight The upper hang points for the karabiners are used for PPG flying You should set seat position side trims and shoulder trims to find comfortab...

Страница 18: ...nsport chassis 7 Insert the transport chassis and secure in the upper position 8 upper position of the transport chassis 9 insert the bottom strut of the frame 10 secure the strut by turning it 45 deg...

Страница 19: ...he bottom frame arch onto the frame strut 14 press in and let the frame safety catch lock in 15 the paramotor can then be removed from the transport case and placed on the floor 16 slide onto the side...

Страница 20: ...of the frame arch onto the frame strut 24 secure with the safety lock 25 26 27 the frame strings do not have the string coupling on the bottom left side due to the suction hose 28 join the remaining f...

Страница 21: ...te 23 10 2012 21 32 secure the seat at the upper press buckles 33 reduction 34 on the carrier fit the propeller pin at the reduction 35 36 individual propeller blades 37 attach the propeller flange 38...

Страница 22: ...w 41 and remove the propeller with the propeller spanner 42 The sharp end of the propeller spanner can be used to lock the catch on the frame arch 43 44 45 Attaching the 2 blade propeller 46 47 the up...

Страница 23: ...read the V strut through the harness tunnel 51 all the way to the front rescue chute container 52 attaching the V strut to the harness 53 correct position of the rescue chute 54 56 Setting the angle o...

Страница 24: ...hten the most upright The pilot in the upright position will be touching the container 62 Cruise control 63 you can lock the cruise control in any position 64 the lock can be released by repeatedly pr...

Страница 25: ...scue chute handle 73 75 76 Bag for the assembled paramotor DO NOT EXPOSE CARBON SKELETON TO THE BRIGHT SUN LIGHT UV RADIATION AND HIGH TEMPERATURE CAN DAMAGE THE DARK SURFACE OF THE CARBON SKELETON DU...

Страница 26: ...then unlock and dismantle the frame arch and continue in the opposite procedure as per picture 45 through to picture 1 80 first put the harness into the transport case 81 correct position of the harn...

Страница 27: ...nto the harness 85 When pulling in the chassis release the locking pin at the bottom 86 insert and secure at the top 87 Installation the Agama watter rescue system of the paramotor 4 attachement point...

Страница 28: ...23 10 2012 28 90 Attachement loops lower on the harness 91 4 attachement points 92 Test of the correct attachement of the Agama lift the paramotor by the Agama ATTNETION Never start the engine without...

Страница 29: ...aramotor firstly on a side then at the top Carefully check the catches When locking upper buckles pay attention to the rescue system belt which has to lead over above the buckles straps Each of these...

Страница 30: ...Examination of exhaust rubber elements 6 Petrol tubes ok 7 Motor carburettor and tank leak proof 8 Sufficient supply of petrol 9 Pilot suspension undamaged 10 Canopy undamaged 11 Gas lever position 1...

Страница 31: ...ler rotation causes forces in this configuration which try to turn all MPGs right This is normally balanced by tightening the cross strap on the harness before start and by left paraglider brake if ne...

Страница 32: ...takeoff speed break the paraglider slightly and take off Run until you fly Do not sit prematurely down into the harness and do not bounce to lift the canopy Release the breaks after takeoff and climb...

Страница 33: ...d Always use quality petrol mode time Mixture oil petrol running in 5 hod 1 40 normal operation 1 50 octane EUROPE UK USA 95 Super S PB Regular S PB Regular Do not use oils intended for high revolutio...

Страница 34: ...ied in the basic set PROPELER MAINTENANCE Always store the propeller in a dry place Do not expose it to sudden temperature changes Store it in horizontal position Do not expose the propeller unnecessa...

Страница 35: ...has free space in 360 gr rotation and it is correctly fixed propeller without damage and dirts belt and tension enough killswitch OK correct petrol the mixture with oil in correct mixture ratio fuel t...

Страница 36: ...Glider the glider should be chaecked each 2 years send to the manufacturer In case of any apparent damage to any part of the MPG it is necessary to repair or replace it before the next flight BE SURE...

Страница 37: ...ns tune the engine turning the H screw see the carburettor setting slow low high revolution transition slow acceleration tune the engine turning the L screw ignition fault carburettor is set correctly...

Страница 38: ...try to secure strap down the MPG by the cage check that it cannot tip over Dismantled disconnect the battery detach the harness propeller and take apart the frame we recommend using the transportation...

Страница 39: ...Last update 23 10 2012 39...

Страница 40: ...Last update 23 10 2012 40...

Страница 41: ...Last update 23 10 2012 41...

Страница 42: ...Last update 23 10 2012 42...

Страница 43: ...Last update 23 10 2012 43 COMPONENTS...

Страница 44: ...Last update 23 10 2012 44 Skeleton Instinct High Line 070901 050108 050108 070903 070902...

Страница 45: ...Last update 23 10 2012 45 Skeleton Instinct Comfort Line...

Страница 46: ...Last update 23 10 2012 46 Frame 070101 070103 070105 L 070105 P 070104 L 070104 P 070108 L 070108 P...

Страница 47: ...Last update 23 10 2012 47 Harness 070102 070128...

Страница 48: ...Last update 23 10 2012 48 010119 010120 020910 010920 070909 020911 010130 010114 010419 010131 010920 070909 020911 020910 010127...

Страница 49: ...cover since 2011 1 pc 010233 Startovac pru ina Starter spring 1 pc 010234 T lo z padky Wheel for rope 1 pc 010235 Startovac palec Finger 1 pc 010236 Kulisa Coulisse 1 pc 010237 Z vla ka Cotter 1 pc 01...

Страница 50: ...0 2012 50 Engine 02 02 xx PG00126 PG00195 M 8X50 PG00126 PG00124 PG00121 PG00123 PG00138 PG00132 PG00196 PG00902 PG00194 PG020211 PG00982 1 PG00137 PG00199 PG00984 1 PG00508 PG00889 PG00140 PG00139 PG...

Страница 51: ...ankshaft box 1 pc PG020211 roub karteru f h screw 6 pc PG00982 1 Pr chodka podtlaku Impulse socket 1 pc PG00132 P st Piston 1 pc PG00139 P stn ep Piston pin 1 pc PG00140 Z vla ka p stn ho epu Circlip...

Страница 52: ...10374 070365 040357 PG00134 PG00351 PG010932 PG00133 5pcs M6x70 2pcs M6x12 PG00702 PG1383 PG00351 PG010932 PG00809 PG01302 PG010358 PG1303 PG00868 V PG00413 4pcs M6x30 PG00437 PG00414 17cm PG020255 PG...

Страница 53: ...10 2012 53 Wiring 020407 070425 070616 070426 070423a 010408 020233 070424 070428 070427 070613 010601 010611 070602 070603 070430a 010612 020421 010402 020422 010418 010410 070419 010920 010409 07061...

Страница 54: ...Last update 23 10 2012 54 Exhaust PG01327 Stainless Steel PG01331 Standart 010510 010243 010508 010504 020502 01 04 07 020503 020505 010510 010243 010511...

Страница 55: ...Last update 23 10 2012 55 Tank 070701 010704 010707 010702 010710 010934 010709 010711 010710 010714 010705 010706...

Страница 56: ...Last update 23 10 2012 56 Reduction High Line 010819 020817 010816 010816 010818 020811 070826 070822 070821 070810 020808 010606 PG00135 020605 020809 070824 020823...

Страница 57: ...Last update 23 10 2012 57 Reduction Comfort Line 02 08 xx 020823 020809 020810 020806 020807 020808 020811 020820 010819 010816 010818 020821 020822 020824 020817...

Страница 58: ...Last update 23 10 2012 58 OPERATING RECORDS SERVICE LIST List of mandatory checks performed repairs important part replacements Operation reason date flight hours signature checked by...

Страница 59: ...Last update 23 10 2012 59 List of mandatory checks performed repairs important part replacements Operation reason date flight hours signature checked by...

Страница 60: ...Last update 23 10 2012 60 List of mandatory checks performed repairs important part replacements Operation reason date flight hours signature checked by...

Страница 61: ...Last update 23 10 2012 61 List of mandatory checks performed repairs important part replacements Operation reason date flight hours signature checked by...

Страница 62: ...Last update 23 10 2012 62 RECORD OF BULLETIN IMPLEMENTATIONS OR MANDATORY CHANGES serial number bulletin number date note performed signature...

Страница 63: ...Last update 23 10 2012 63 DAILY OPERATING RECORDS date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 64: ...Last update 23 10 2012 64 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 65: ...Last update 23 10 2012 65 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 66: ...Last update 23 10 2012 66 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 67: ...Last update 23 10 2012 67 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 68: ...Last update 23 10 2012 68 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 69: ...Last update 23 10 2012 69 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 70: ...Last update 23 10 2012 70 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 71: ...Last update 23 10 2012 71 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 72: ...Last update 23 10 2012 72 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 73: ...Last update 23 10 2012 73 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 74: ...Last update 23 10 2012 74 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 75: ...Last update 23 10 2012 75 date take off and landing place daily in all notes flight faults repairs consumption flights number flight time flights number flight time...

Страница 76: ...Last update 23 10 2012 76 NOTES...

Страница 77: ...Last update 23 10 2012 77 NOTES...

Страница 78: ...Last update 23 10 2012 78 NOTES...

Страница 79: ...Last update 23 10 2012 79 NOTES...

Страница 80: ...Last update 23 10 2012 80 NOTES...

Страница 81: ...Last update 23 10 2012 81 NOTES...

Страница 82: ...Last update 23 10 2012 82 NOTES...

Страница 83: ...e 23 10 2012 83 EQUIPMENT Engine configuration Frame arches pcs spare Frame struts pcs spare Propeller flange bolt 1300 Bags Engine Frame Propeller Harness Complet Air bag Battery Key reduction propel...

Страница 84: ...ng assembly of mechanical parts and damages caused by falls The warranty ceases if the MPG is sold to the third person or in case of incorrect use unprofessional repair or use of unoriginal parts The...

Страница 85: ...Last update 23 10 2012 85 NIRVANA SYSTEMS s r o Jate n 523 760 01 Zl n Czech Republic tel 420 577226616 fax 420 577019117 sms 420 775917001 e mail info nirvana cz http www nirvana cz...

Отзывы: