Nr.
Namn.
Beskrivning / Åtgärd
ERR 03
Faulty moisture sensor
Replace the moisture sensor. See pos 206, ‘Spare parts’.
ERR 04
Max time of process
The max time of the drying process has been exceeded (the
preset value of 240 min. can be changed with parameter
P2133).
ERR 05
Overloading
1.Check low and high pressure controls.
2. Reset the max current relay in the electric box.
3. If the problems persist, contact the supplier.
ERR 12
Timeout communication
Communication between the control panel and the circuit
board has been lost temporarily.
7.2 Error codes
8 Dismantling the door switch
See pictures J and K
A Lock plate
B Door switch
C Mounting screw
D Mounting screw
1
Dismantle the front plate. See section
‘Dehumidify-
ing unit’.
2
Loosen the lock plate
(A)
and push out the door
switch
(B)
from the bottom plate.
3
To get the door switch out, the top part must be
lifted up at the front. See next section.
Loosen the top part
4
Loosen the four screws
(C)
and the two screws
(D)
that secure the air duct. Put in two pipes for lifting
and lift the top part a little at the front so the door
switch(es) can be taken out.
Fitting the pipes for lifting
To make it easier to lift the top part, fit the pipes for lifting
at the front of the top part.
To reset the alarm, push and hold the
START/STOP
button for 5 sec.
34
ENGLISH
Содержание FT 120 VP
Страница 3: ...A A B C D E 3 ...
Страница 5: ...B A F 5 ...
Страница 8: ...C D Montering av lyftrör Nostoputkien asennus Fitting the pipe for lifting K 8 ...
Страница 10: ......
Страница 35: ...Reservdelar Varaosat Spare Parts ...
Страница 43: ......
Страница 44: ...Gematech Innovation ...