5.
Function
5.0 Operational Instructions
CAUTION
Ensure that the spray gun or low pressure valve is closed before
start
The S Booster is bled by loosening the bleeding screw at the top of
the pump stations. The screw must be left open for approx. 4
minutes allowing water to run out.
All pipes are bled by opening the connections one after the other. It
may be necessary to repeat this procedure.
5.1
Operation of Booster controller
Please see MPC User guide!