
-
A13
・
-
VBA12001-R.3668.A
#291×3
#290×3
#635×2
#635×2
#B286
#B261
・
Attach 3 screws (#291) until the
metering FPC unit is lightly
fixed.
Give the reference screw 1 turn
counterclockwise.
#B2008
#796
Reference screw
Eyepiece unit
Metering FPC unit
・
Position the eyepiece unit (#B261)
downward and fix it with 2 screws
(#635).
・
Attach the tape (#796).
・
Fix the metering FPC-base unit
(#B286) with 2 screws (#635).
・
Attach the metering FPC unit (#B2008)
and 3 springs (#290) temporarily with
3 screws (#291)
.
Note: Be careful that slack here
catches the rear body when it
is assembled.
No slack
2 pieces of tape (#709)
2 pieces of tape (#709)