Height Rider/SP Series
Operating & Safety Instructions
English/USA – 07/17
Original instructions
44
GEARBOX DISENGAGEMENT (TYPE 2)
The drive gearboxes located on the front and rear wheel hubs must be disengaged as follows;
1)
Remove both retaining bolts that secure the cover disc to the centre of the wheel hub.
2)
Partially screw one of the retaining bolts into the end of the central disengage pin and pull the pin
out fully, ensuring the recess on the pin is visible.
3)
Place the cover disc over the pin, ensuring the retaining disc is engaged in the pin recess and
secure in place using the remaining retaining bolt.
4)
To re-engage the gearbox, complete the above instructions in reverse order, ensuring gearbox
drive is free to engage before pushing the pin ‘home’. If necessary, jack up each wheel & rotate
slightly to allow re-engagement of pin.
4.7.3
CRANEAGE
1)
Observe all of the limitations relating to straps and chains stated above under ‘Transporting’.
(4.7.1)
2)
When utilising the designated lifting points never apply a ‘snatch’ load, i.e. lift slowly to take up
the load before raising. Similarly, do not drop machine when positioning after lifting.
3)
If the machine is to be lifted by crane, use the designated lifting points and observe the
recommendations regarding spreader beams. Individual drawings are available for each machine
type, on request. (See list below.)
D81790
HR15/17 4x4/Hybrid MK2
D81795
HR15N/17N
D81980
HR21 MK2
4.7.4
STORAGE
If being stored for any length of time without use, then the machine should be thoroughly inspected for
the following:-
1)
Grease all bearings /slides, worm drives, etc.
Содержание HR21 4x4
Страница 22: ...Height Rider SP Series Operating Safety Instructions English USA 07 17 Original instructions 20...
Страница 79: ......