8
Nieco Corporation - Model JF94E CE
B. INSTALLATION
B.1 Pre-Installation
Uncrate the broiler and inspect for shipping damage. Remove the tape securing the machine parts, and
install the parts in their proper location. If there are obvious or concealed damages to any part of the
broiler, please contact your freight carrier. The factory warranty does not cover freight damage.
B.2 Mounting
Follow the mounting instructions if this function is not performed by the installer.
B.3 Leveling
The grease drain system is based on a gravity-flow design. Therefore, it is extremely important that the
broiler be placed on a level surface.
B.4 Hood Requirements
This appliance must be installed under a ventilation hood of adequate size.
Do not obstruct the flow of combustion and ventilation air. An adequate air supply must be available for
safe and proper operation.
B.5 Clearance
Keep appliance area free from combustibles.
To facilitate disassembly and service of the unit a minimum of 24” (610 mm) should be allowed on the
control panel (feed end) of the broiler.
B.6 Electrical Connection
Power requirements are stated on the unit nameplate and must be connected accordingly. Before start-
ing broiler, tighten all electrical connections in control box. An electrical wiring diagram can be found
inside the control box.
Note: Disconnect power before servicing.
B.7 Pre-Operation Check
Be sure that all parts are installed in the proper location.
REQUIRED for
installation near
combustible walls
and construction
REQUIRED for installa-
tion near non-com-
bustible walls and
construction
RECOMMENDED by
Nieco for proper disas-
sembly and service
Back of broiler
Sides of broiler
Front of broiler
(Feed end)
REQUIRED AND RECOMMENDED CLEARANCES
12” (305 mm)
0” (0 mm)
0” (0 mm)
24” (610 mm)
0” (0 mm)
0” (0 mm)
0” (0 mm)
12” (305 mm)
12” (305 mm)
All manuals and user guides at all-guides.com
Содержание JF94E
Страница 43: ...All manuals and user guides at all guides com...