background image

PROGRAMMING

7

Nieco Corporation - ExVection Toaster 6220

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

PROGRAMMING

Use the  

 

 

    buttons to change settings.

To program the time and heat, hold down the button you 
wish to program for 3 seconds.

Push the button again to change the bottom heat.

Push the button again to change the speed. 

Push and hold the button for 3 seconds to save changes.

4

20

20

The display will show

This is the top heat setting, 0 is off and 20 is the 
maximum setting. For most products, set to 20.

4

The display will show

 0

0

This is the bottom heat setting, 0 is off and 20 is the 
maximum setting. For most products, set to 20.
Some toasters are top heat only, and do not have 
bottom heaters.

4

13

13

The display will show

This is the time, in seconds, that it takes to toast. 

4

>++<

>++<

The display will show

This means the changes have been saved.

 

 

 

 

 

 

 

 

 

 

 

 

CLEANING AND MAINTENENCE

2

3

4

5

Tools

Instructions

1.

Wait for toaster to cool

.

2. 

Remove the front guard.

3.

Lift belt and brush the area between the belt.

4.

Remove the crumb pan.

5. 

Wipe the cavity of the toaster.

Note: The speed can be

changed temporarily by

using the up or down

arrows but will default

to programmed settings

when a preset button is

pressed. Permanent

speed changes must be

done in programming

mode.

Содержание ExVection 6220

Страница 1: ...A F E T Y Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance IMPORTANT RETAIN THIS MANUAL IN A SAFE PLACE FOR FUTURE REFERENCE Toaster mu...

Страница 2: ...Preparation and Installation Operating Safety 4 Electrical Safety 5 Clearance Requirments Operating Instructions and Settings 6 Programming Cleaning and Maintenence 7 Troubleshooting Guide Replacing...

Страница 3: ...eat source With ExVection technology the moisture barrier is dispensed allowing better heat transfer and toasting The efficiency obtained by utilizing an ExVection toaster adds up to big dollar sav in...

Страница 4: ...e all clearance requirements to provide air supply for proper operation as well as sufficient clearance for servicing Keep the area around the equipment free and clear of combustibles Dimensions and c...

Страница 5: ...operations different from those intended could result in a hazardous situa tion SERVICE Have equipment serviced by a qualified repair person using only identical replacement parts This will ensure tha...

Страница 6: ...eyor belt will start moving Push the product selection button for the item you want to toast The control will set the speed and heat level When you are done with the toaster push the power button to t...

Страница 7: ...tom heat setting 0 is off and 20 is the maximum setting For most products set to 20 Some toasters are top heat only and do not have bottom heaters 4 13 13 The display will show This is the time in sec...

Страница 8: ...Loosen set screw on motor sprocket remove 2 remain ing motor mounting bolts and remove motor 5 Installation is the reverse of removal Leave the motor mounting bolts loose 6 Adjust motor so there is 3...

Страница 9: ...5 16 G r ound Ter m i nalB l ock P N 4405 18 PRI 230V SEC 36V 18V R B 10 10 ga R B B B W B R W M ot orC abl e B W B Heating Elements P N TBD High Pressure Blower 24VDC P N 18447 Main Power Switch P N...

Страница 10: ...wing Nieco ExVection Toaster Warranty Labour warranty is subject to these limitations 1 Labour warranty work is to be performed during regular working hours Off hour labour may be subject to additiona...

Страница 11: ...add alter or delete specific parts as the machine specification or parts availability changes A current schedule can be obtained from Nieco Any other warranty work is on an as required basis and will...

Страница 12: ...ess Steel 4 7 KW max 23 Amps 208Volts Single phase 16 8 H x 24 59 L x 18 54 W 96 Lbs 1 75 Revision History 5 02 2013 Released A Date Notes REV Nieco Corporation 7950 Cameron Drive Windsor CA 95492 707...

Отзывы: