8
STEP-BY-STEP LIGHTING PROCEDURE
Before lighting, make sure that all parts are installed in the proper location, all controls are turned off,
and the ventilation hood fan is turned on.
1. Turn on Main Power Switch.
1
2
2. Turn on Motor Switch.
3. Set Motor Speed Control knob to
3
4
desired setting. (Use “40” to start).
4. Set Meat Holding Temperature by
adjusting the temperature controller.
(Use 190° F setting to start).
5. Open the Manual Gas Valve. The valve is
5
6
open when the handle is in-line with the pipe.
6. Push and hold the Red Push Button Valve.
This will start the flow of gas to the pilot lights.
While holding in the Red Button, push the Igniter
button on the front of the control box. After the
pilot lights, hold the Red Valve in for 30 seconds
to allow the thermocouple to heat. When you
release the Red Push Button, the burners
should ignite.
If the igniter is not working, use a long-stem
lighter to manually light the pilot.
7. After lighting the broiler, check the gas pressure
to be sure it is adjusted to the levels stated on the
machine rating plate. Allow the broiler at least
30 minutes to warm up.
SHUTDOWN PROCEDURE
For EMERGENCY shutdown, turn off the Main Power switch and shut off the manual gas valve.
For PLANNED shutdowns - clear machine of all food products, turn the motor and main switches off.
CAUTION: Turn all appliance switches off before disconnecting cord from power supply.
Содержание 522G
Страница 10: ...10 D PARTS AND LOCATION Model 732 735 Gas Feed End View...
Страница 11: ...11 Model 732 735 Gas Right Side View...
Страница 12: ...12 Model 732 735 Gas Left Side View...
Страница 15: ...15 Model 532 535 Gas Left Side View...
Страница 30: ...30 J WIRING DIAGRAM Models 732 735 532 535G Domestic U S A...
Страница 31: ...31 Models 732 735 532 535G International Export Models...
Страница 32: ...32 Model 522G Domestic U S A...
Страница 33: ...33 Model 522G International Export Models...