
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
Date
Signa-
ture
Notes
Description
✔
Heat pump (page
Shut off valves
Hot water (
)
Shut off valves
Mixing valve
Cold water (
)
Shut off valves
Non-return valve
Safety valve
Electricity (page
)
Sensors
Electrical anode (VPB S/ VPBS S
enamel only)
NIBE VPB S/ VPBS S
Chapter 1 | Important information
6
Содержание VPB S Series
Страница 1: ...CHB EN 2126 2 531224 USER AND INSTALLER MANUAL Water heater Accumulator tank NIBE VPB S VPBS S...
Страница 2: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......