Nibe VPB S Series Скачать руководство пользователя страница 12

SYMBOL KEY

Meaning

Symbol

Unit box

Shut-off valve

Non-return valve

Mixing valve

Circulation pump

Expansion vessel

Filterball

Pressure gauge

P

Safety valve

Temperature sensor

Manual reversing valve/shunt

Radiator system

Domestic hot water

Addition

Hot water circulation

TO HEAT PUMP

VPB S/ VPBS S can be docked with another heat source,
for example NIBE S1155.

• Install expansion vessel and pressure gauge as illus-

trated.

• Install the safety valve as illustrated. Recommended

opening pressure is 0.25 MPa (2.5 bar). For information
about max opening pressure, see technical specifica-
tions.

P

XL9

XL8

CONNECTING COLD AND HOT WATER

The settings for hot water are made in the compatible
product’s menu system.

Install as follows:

• controlling hot water sensor (BT6) (placed in the

middle of the water heater)

• vacuum valve (FL6) (vacuum valves only apply to

copper)

• shut-off valve

• non-return valve

• pressure relief valve

The safety valve must have a maximum 1.0 MPa (10.0
bar) opening pressure and be installed on the incoming
domestic water line as shown.

• mixing valve

A mixer valve must also be installed, if the factory
setting for hot water is changed. National regulations
must be observed.

XL3

XL4

NIBE VPB S/ VPBS S

Chapter 3 | For the Installer

12

Содержание VPB S Series

Страница 1: ...CHB EN 2126 2 531224 USER AND INSTALLER MANUAL Water heater Accumulator tank NIBE VPB S VPBS S...

Страница 2: ......

Страница 3: ...2 For the User 7 Maintenance 8 3 For the Installer 8 Delivery and handling 9 The water heater design 11 Pipe installation 14 Electrical installation 16 Commissioning and adjusting 17 4 Technical data...

Страница 4: ...ater pipe must be routed to a suitable drain and be inclined to prevent water pock ets and must also be frost proof The over flow pipe must be at least the same size as the safety valve The overflow p...

Страница 5: ...ion or dealer who provides this type of service Improper disposal of the product by the user results in administrative penalties in accordance with current le gislation Compatible products VPB S300 VP...

Страница 6: ...e carried out by a suitably qualified person Date Signa ture Notes Description Heat pump page 11 Shut off valves Hot water page 11 Shut off valves Mixing valve Cold water page 11 Shut off valves Non r...

Страница 7: ...this pressurised water heater Con tact your installer TIP The safety valve is not delivered with VPB S VPBS S Contact your installer if you are unsure how to check it EMPTYING Water heater Draining is...

Страница 8: ...perature of at least 10 C frost free and be provided with a floor drain Position VPB S VPBS S on a firm base that can take the weight preferably on a concrete floor or foundation Use the product s adj...

Страница 9: ...gn VPB S200 VPB S300 VPBS S300 The figure shows VPBS S300 UL UA2 FR1 QM22 W1 UA1 XL5 XL9 XL3 XL4 XL8 XL13 XL8 XL4 XL3 XL9 XL14 XL5 FR1 QM22 W1 UA1 UL UA3 UA2 PZ1 PZ1 BT7 BT7 9 Chapter 3 For the Instal...

Страница 10: ...g system VPBS S300 only XL14 1 or other heat source HVAC components Venting charge coil QM22 Submerged tube for displaying hot water sensor BT7 UA1 Submerged tube for controlling hot water sensor BT6...

Страница 11: ...er SYSTEM DIAGRAM VPB S VPBS S is a series of water heaters that are suitable for connection to e g a heat pump VPB S VPBS S consists of a hot water tank with internal anti corrosion protection made o...

Страница 12: ...information about max opening pressure see technical specifica tions P XL9 XL8 CONNECTING COLD AND HOT WATER The settings for hot water are made in the compatible product s menu system Install as foll...

Страница 13: ...l heat source tank BT54 pressure gauge expansion vessel pressure relief valve AXC module circulation pump sensor external heat source BT53 P XL14 XL13 Connecting hot water circulation VVC VPB S VPBS S...

Страница 14: ...fitted at the fact ory and placed in a submerged tube UA1 the con trolling hot water sensor BT6 is placed in the sub merged tube for control sensor UA2 In cases where it is only possible to connect on...

Страница 15: ...to be connected to the potentio stat 1 Route the anode cable W1 along the docking pipe supply line XL8 2 Connect the anode cable W1 to the potentiostat 3 Connect the potentiostat to a suitable 230 V...

Страница 16: ...he climate system via the relevant vent valves 2 Keep topping up and venting until all air has been removed and the pressure is correct The figure shows VPB S200 XL3 QM22 START UP AND INSPECTION Press...

Страница 17: ...ons 626 600 30 126 195 478 391 25 50 1475 80 100 560 440 626 600 28 43 205 126 553 478 13 391 25 50 1775 80 560 440 VPB S200 VPB S300 VPBS S300 17 Chapter 4 Technical data NIBE VPB S VPBS S 4 Technica...

Страница 18: ...ciency class A to F 2 With the feet removed the required ceiling height is approx 1650 mm Stainless Enamel Copper VPB S300 C C C Efficiency class1 282 274 278 litre Volume 8 8 8 4 2 litre Volume charg...

Страница 19: ...operating temperature 3 0 3 bar MPa Max pressure primary side 10 1 0 bar MPa Max pressure water heater 1800 mm Height 1950 mm Required ceiling height2 600 mm Width 626 mm Depth 150 137 kg Net weight...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ...e fi NORWAY NETHERLANDS GREAT BRITAIN ABK Qviller AS Brobekkveien 80 0582 Oslo Tel 47 23 17 05 20 post abkqviller no nibe no NIBE Energietechniek B V Energieweg 31 4906 CG Oosterhout Tel 31 0 168 47 7...

Страница 24: ...y Systems All product illustrations facts and data are based on the available information at the time of the publication s approval NIBE Energy Systems makes reservations for any factual or printing e...

Отзывы: