Nibe VPA 200 Скачать руководство пользователя страница 21

MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST

*

ll

A

   installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.  
A Building Regulations Compliance Certificate will then be issued to the customer.  

©Heating and Hotwater Industry Council (HHIC)   

 

 

 

              www.centralheating.co.uk

ALL SYSTEMS PRIMARY SETTINGS

 (indirect heating only) 

Is the primary circuit a sealed or open vented system? 

Sealed 

  

Open 

 

What is the maximum primary flow temperature? 

 

°C

ALL SYSTEMS 

What is the incoming static cold water pressure at the inlet to the system? 

 

bar

Has a strainer been cleaned of installation debris (if fitted)? 

Yes 

  

No 

Is the installation in a hard water area (above 200ppm)? 

Yes 

  

No 

If yes, has a water scale reducer been fitted? 

Yes 

  

No 

What type of scale reducer has been fitted? 

What is the hot water thermostat set temperature? 

 

°C

What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? 

  

l/min

Time and temperature controls have been fitted in compliance with Part L of the Building Regulations? 

 

Yes 

 

Type of control system (if applicable) 

Y Plan 

 

S Plan 

 

Other 

 

Is the cylinder solar (or other renewable) compatible? 

Yes 

  

No 

What is the hot water temperature at the nearest outlet? 

 

°C

All appropriate pipes have been insulated up to 1 metre or the point where they become concealed 

 

Yes 

 

UNVENTED SYSTEMS ONLY 

Where is the pressure reducing valve situated (if fitted)?

What is the pressure reducing valve setting?  

 

bar

Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested? 

Yes 

  

No 

The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations 

 

Yes 

Are all energy sources fitted with a cut out device? 

Yes 

  

No 

Has the expansion vessel or internal air space been checked? 

Yes 

  

No 

THERMAL STORES ONLY 

What store temperature is achievable? 

 

°C

What is the maximum hot water temperature? 

 

°C

ALL INSTALLATIONS 

 

The hot water system complies with the appropriate Building Regulations 

Yes 

 

The system has been installed and commissioned in accordance with the manufacturer’s instructions 

Yes 

 

The system controls have been demonstrated to and understood by the customer 

Yes 

 

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer 

Yes 

 

Commissioning Engineer’s Signature

Customer’s Signature

(To confirm satisfactory demonstration and receipt of manufacturer’s literature)

This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of 
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.  

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.      

Customer Name  

Telephone Number

Address 

Cylinder Make and Model 

Cylinder Serial Number 

Commissioned by 

(print name)

 

Registered Operative ID Number

Company Name 

Telephone Number

Company Address

 

 

Commissioning Date 

To be completed by the customer on receipt of a Building Regulations Compliance Certificate

*

:

Building Regulations Notification Number 

(if applicable)

Содержание VPA 200

Страница 1: ...User and Installer manual UN VPA 300 200 UK Indirect heated storage water heater CHB GB 1711 2 331894...

Страница 2: ......

Страница 3: ...Table of Contents 4 1 Important information 7 2 For the User 8 3 For the Installer 17 4 Technical data 20 Item register 3 Table of Contents VPA 300 200...

Страница 4: ...not dispose of used products with normal household waste It must be disposed of at a special waste station or dealer who provides this type of service Improper disposal of the product by the user resu...

Страница 5: ...ase ensure that the installer has fully completed the Benchmark Checklist in the end of the Installation Instruc tions supplied with the product and that you have signed to say that you have received...

Страница 6: ...te Signature Notes Description Heat pump page 14 Shut off valves Venting valve Shut off valve Hot water page 14 Shut off valves Mixing valve Expansion vessel T P valve Tundish Cold water page 14 Shut...

Страница 7: ...an be opened and a pipe coupling on the hot water side can be loosened The climate system 1 Cut the current to the immersion heater and solenoid valve 2 Shut off the incoming cold water Empty the doub...

Страница 8: ...1 C R 0 R 0 2 0 2 1 R 0 H M flo w 4 9 5 0 C H o t w a te r 5 1 C 2 0 2 1 R 0 H M flo w 4 9 5 0 C H o t w a te r 5 1 C R 0 Assembly The water heater is only designed for upright installation The water...

Страница 9: ...gnation T P valve FL5 Venting heating medium QM20 Submerged tube hot water heating 10 mm int sensor BT6 UA1 Submerged tube connection temperature limiter 11 mm int UA2 Adjustable feet UL1 Lifting eye...

Страница 10: ...s approx 200 mm less without the insulated jackets Insulation removed Do not use any tools when dis mantling the joining plate The figure shows VPA 300 200 Cu with insulation UN UN Carry out assembly...

Страница 11: ...losed cover discs before pipe installation The cover discs with self adhesive backs must be installed on the relevant connection by pushing them over the connections All connections including connecti...

Страница 12: ...ve QN17 Cold water inlet and pressure relief valve water heater RM1 Pocket tube UA2 There s a plug on the cold water inlet valve that can be removed and there mount the flexble hose for the ex panssio...

Страница 13: ...Temperaure sensor return BT3 Drain valve QM1 Hot water sensor BT6 Shut off valve QM30 Temperaure sensor condenser out BT12 Shut off valve QM40 Indoor sensor BT50 Shut off valve QM41 Return line sensor...

Страница 14: ...Tundish Metal discharge pipe from temperature relief valve to tundish Safety device e g temperature relief valve 300 mm minimum Metal discharge pipe from tundish with continous fall Possible wall Disc...

Страница 15: ...the incoming cold water pipe and the heating sys tem Open the filling valve The primary part of the VPA 300 200 can now be filled with water 2 After a while the pressure gauge if installed will show r...

Страница 16: ...d with one hot water sensor for display and control The sensor is positioned in the pocket tube for the sensor UA1 Use the sensors provided with the heat pump control module Whennoheatsensorshavebeenp...

Страница 17: ...Dimensions VPA 300 200 20 55 204 1757 951 1351 879 852 256 306 170 100 100 17 Chapter 4 Technical data VPA 300 200 4 Technical data...

Страница 18: ...m Connection cold water XL3 28 mm Connection hot water XL4 G1 Connection docking in XL8 G1 Connection docking out XL9 15 mm Connection T P valve XL29 G2 Connection for immersion heater XL35 can be use...

Страница 19: ...above 40 C 10 4 kW Heat transfer 60 50 C at 60 C hot water temperature 13 2 kWh Heat content at 50 C 90 C Max temperature heating fluid 90 C Max operating temperature T P valve 25 kW Maximum power su...

Страница 20: ...Marking 4 P Pipe connections Cleaning the climate system 15 Hard water areas 15 S Safety information 4 Inspection of the installation 6 Marking 4 Symbols on VPA 300 200 4 Warranty information 5 Symbol...

Страница 21: ...e and pressure relief valve and expansion valve been fitted and discharge tested Yes No The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations Yes...

Страница 22: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 23: ......

Страница 24: ...on a343 WS release date 2017 04 04 08 10 Publish date 2017 04 04 08 29 NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info nibe co...

Отзывы: