Nibe VEDEX 1000 Скачать руководство пользователя страница 1

INSTALLATION AND MAINTENANCE INSTRUCTIONS

 

VEDEX 1000

LEK

PL

NO

NL

FI

DK

DE

CZ

NIBE – Haato, 

Valimotie 27,  01510 Vantaa

3C Broom Business Park, Bridge Way, Chesterfield S41 9QG

Puh: 09-274 697 0  Fax: 09-274 697 40  E-mail: [email protected]  www.haato.fi

NIBE-BIAWAR Sp. z o. o.  

Aleja Jana Pawła II 57,  15-703  BIAŁYSTOK

Tel: 085 662 84 90  Fax: 085 662 84 14  E-mail: [email protected]  www.biawar.com.pl

NIBE AB

,  Jerikoveien 20,  1067 Oslo

Tel: 22 90 66 00  Fax: 22 90 66 09  E-mail: [email protected]  www.nibe-villavarme.no

NIBE Energietechniek B.V.

, Postbus 2, NL-4797 ZG  WILLEMSTAD (NB)

Tel: 0168 477722  Fax: 0168 476998  E-mail: [email protected]  www.nibenl.nl

Vølund Varmeteknik

,  Filial af NIBE AB,  Brogårdsvej 7,  6920 Videbæk

Tel:  97 17 20 33  Fax: 97 17 29 33  E-mail: [email protected]  www.volundvt.dk

NIBE Systemtechnik GmbH

,  Am Reiherpfahl 3,  29223 Celle

Tel: 05141/7546-0  Fax: 05141/7546-99  E-mail: [email protected]  www.nibe.de

NIBE CZ,

  V Zavetri 1478/6,  CZ-170 00 Prague 7

Tel: +420 266 791 796  Fax: +420 266 791 796  E-mail: [email protected]  www.nibe-cz.com

NIBE AB Sweden,

  Box 14,  Järnvägsgatan 40,  SE-285 21 Markaryd

Tel: +46-(0)433-73 000  Fax: +46-(0)433-73 190  E-mail: [email protected]  www.nibe.eu

GB

NIBE Energy Systems Ltd,

Tel: 0845 095 1200  Fax: 0845 095 1201  E-mail: [email protected]  www.nibe.co.uk

MOS GB 0733-1 
VEDEX 1000
M10527

Содержание VEDEX 1000

Страница 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS VEDEX 1000 LEK MOS GB 0733 1 VEDEX 1000 M10527...

Страница 2: ......

Страница 3: ...rates_____________________________ 9 Chimney__________________________________________ 9 Assembly ________________________________________ 10 Turbulators _ _____________________________________ 10 Pip...

Страница 4: ...ty product offering a long service life and safe operation This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experien...

Страница 5: ...bottom of the boiler The hot water is led from the accumulator tanks to the radiator circuit via a shunt valve SV1 where the desired temperature to the radiators is maintained by mixing the hot boile...

Страница 6: ...essure gauge 42 The boiler s pressure is displayed here The gauge is graded 0 4 bar with a red mark at 1 5 bar Max permitted pressure is 1 5 bar at 100 C For a closed system the operating pressure var...

Страница 7: ...oblem it is recommended to use hard wood or a mixture of woods with a moisture content of about 18 20 Carpentry off cuts should not be used When the wood starts to burn it breaks up whereupon combusti...

Страница 8: ...direct damper 5 pressed in position Open the combustion chamber door 68 fully Open the filler door 65 When starting with a cold smoke duct first light a few pieces of screwed up newspaper to increase...

Страница 9: ...es from the hearth to the top of the chim ney You can check the boiler s fire affected surfaces and flue gas ducts yourself to determine how often the boiler should be swept Gas which contains tar sub...

Страница 10: ...tart the circulation pump and check its function Secure the protective hood in place It is usually easier to aid the circulation pump to start if it is off If helping the circulation pump to start whe...

Страница 11: ...aught regulator VEDEX 1000 is supplied with a draught regulator which is installed to the left between the soot door and the filler door Set according to the instructions see Adjusting the draught reg...

Страница 12: ...th boiler These are located in the ducts in the boiler s convection part as illustrated The turbulators effect the turbulence of the flue gases which means that a greater amount of energy is transferr...

Страница 13: ...ling Fill the boiler using a fixed filler line to one of the expan sion connections or a hose in the drain valve Draining Drain by connecting a hose to the drain valve The con nection dimension of the...

Страница 14: ...AVT BV Component key AV Shutoff valve AVT Drain valve BV Check valve CP1 Charge pump CP2 Circulation pump ELK Electrical cassette immersion heater EXP Expansion tank LV Venting valve MV Motor valve R...

Страница 15: ...function Switch 45 set to position 0 means that the charge pump is off Position 1 is the normal operating position Charge thermostat 19 only controls the charge pump Electrical circuit diagram Electri...

Страница 16: ...18 33 82 22 96 64 85 61 103 100 42 40 45 19 5 115 0 164 0 208 0 369 5 187 5 375 0 48 0 5 5 15 0 11 0 12 0 11 0 107 2 10 5 15 0 97 8 23 2 52 8 53 5 H l 36 Slitsad baksida H l 11 5x29 H l H l 19 45 40 4...

Страница 17: ...15 VEDEX 1000 For the Installer Technical specifications Main dimensions 515 380 95 115 78 450 133 utv 225 830 1017 90 20 40 1043 390 R25 inv R25 inv R25 inv R25 inv 15 utv...

Страница 18: ...RSK No 621 07 40 Part no 089 732 LEK LEK Other accessories Insulated accumulator tank with 120 litres storage tank and 380 litres accumulator volume Part no 089 870 Insulated accumulator tank 500 lit...

Страница 19: ...able output when lighting wood 25 kW Wood magazine volume 75 litres Wood magazine width 300 mm Wood magazine depth 420 mm Filler door width 300 mm Filler door height 250 mm Max permitted total current...

Страница 20: ...mounting points in the boiler Lift out the turbulators from the convection part Sweep the convection part Reinstall the turbulators Reinstall the soot door Sweeping LE K 1 3 4 5 6 2 LEK Cover plate T...

Страница 21: ...19 VEDEX 1000...

Страница 22: ...20 VEDEX 1000...

Страница 23: ......

Страница 24: ...STAD NB Tel 0168 477722 Fax 0168 476998 E mail info nibenl nl www nibenl nl V lund Varmeteknik Filial af NIBE AB Brog rdsvej 7 6920 Videb k Tel 97 17 20 33 Fax 97 17 29 33 E mail info volundvt dk www...

Отзывы: