
6
Buff er tank with coil
UKVS 20-300/1000
1
3
5
5
8
7
7
5
10
12
14
15
16
4
7
9
7
2
11
13
6
1. Vent
2. Upper tank insulati on
3. Connector pipe (heati ng system supply)
4. Connector pipe (supplying from the heat source)
5. Temperature sensor cover
6. Steel tank
7. Connector pipe
8. Coil supplying connector pipe
9. Tank insulati on
10. Connector pipe, return from the coil
11. Connector pipe (return to the heat source)
12. Connector pipe (return from the heati ng system)
13. Lower tank insulati on
14. Adjustable foot
15. Thermometer
16. Connector pipe for mounti ng electric heati ng unit
Fig. 5
Secti on of the
UKVS 20-750/1000 buff er tank
Fig. 6
Side view of the UKVS 20-750/1000 buff er tank
INSTALLATION AND OPERATING MANUAL