Pipe installation

Pipe installation must be carried out in accordance with
current norms and directives.

The drain valve is installed on the heating system’s return
line (XL9).

The system where UKV 20-500 is installed must be sup-
plied with a safety valve of max. 6 bar (0.6 MPa), and the
system where UKV 20-750 or UKV 20-1000 is installed
must be supplied with a safety valve of max. 3 bar (0.3
MPa). The overflow pipe must be the same size as the
safety valve. Route the overflow pipe from the safety
valve, sloping along its entire length, and ensure that it
is frost proof. The mouth of the overflow pipe must be
visible and not placed close to electrical components.

Filling

Fill the accumulator tank as follows:
1. Open the vent valve (QM25) at the top of the accu-

mulator tank.

2. Fill the vessel through the drain valve.
3. When only water comes out of the vent valve (ini-

tially an air-water mixture comes out of the valve),
the vent valve can be closed the accumulator tank
is filled.

Electrical installation

NOTE

Electrical installation and service must be car-
ried out under the supervision of a qualified
electrician, and in accordance with applicable
electrical safety regulations.

UKV 20-750 and UKV 20-1000 can be equipped with an
immersion heater and UKV 20-500 can be equipped with
up to two immersion heaters.

Each immersion heater is supplemented with junction
box type K11 (2-pole thermostat, 3-pole temperature
limiter). Do not modify or reconnect! A separate supply
from group central is routed to each immersion heater.

NOTE

The accumulator tank must be completely filled
with water before it can be connected on the
electrical side.

13

Chapter 3 |

For the Installer

NIBE UKV 20

Содержание UKV 20 Series

Страница 1: ...User and Installer manual NIBE UKV 20 20 500 20 750 20 1000 Accumulator tank CHB EN 1743 1 431416...

Страница 2: ......

Страница 3: ...Table of Contents 4 1 Important information 6 2 For the User 7 3 For the Installer 14 4 Technical data 19 Contact information 3 Table of Contents NIBE UKV 20...

Страница 4: ...or ma chine Caution This symbol indicates important information aboutwhatyoushouldobservewhenmaintain ing your installation TIP This symbol indicates tips on how to facilitate using the product Markin...

Страница 5: ...e heating installation to be inspected before it is commissioned The inspection must be carried out by a suitably qualified person Date Signature Notes Description Heating medium page 13 Shut off valv...

Страница 6: ...n valve if fit ted During draining air must be let into the accumulator tank by opening a vent valve or a hot water connection To ensure that the accumulator tank drains completely a hose or a pipe wi...

Страница 7: ...the accumulat or tank UKV 20 750 and UKV 20 1000 are equipped with a special pressure gauge This gauge is located on the left side of the accumulator tank and is tasked with prevent ing the stratific...

Страница 8: ...ection heating system supply XL8 int 1 Docking connection heating system return XL9 int 2 Connection immersion heater XL35 int 2 Docking connection level 1 XL41 int 2 Docking connection level 2 XL42 i...

Страница 9: ...ing plate on all parts of the jacket Remove the insulated jacket Remove the four insulated jacket sections the outer diameter of the accumulator tank decreases by 100 mm without the insulated jackets...

Страница 10: ...be equipped with the following ele ments connection dimension G50 When installing the water heater ensure that there is enough room in front of the connection area to remove the element see fol lowin...

Страница 11: ...ntrolled a UKV tank is installed as a volume and flow increaser Volume increase as well as reduction of heat spikes For houses When the system volume in the climate system is below 20 l kW heat pump o...

Страница 12: ...uncontrolled a UKV tank is installed as a flow increaser A UKV tank is installed to reduce heat spikes in the climate system Diagram for charging the hot water production BT6 BT7 AA5 GP11 VVC VV KV Fo...

Страница 13: ...the top of the accu mulator tank 2 Fill the vessel through the drain valve 3 When only water comes out of the vent valve ini tially an air water mixture comes out of the valve the vent valve can be cl...

Страница 14: ...00 350 967 21 0 15 357 387 897 1277 1437 1855 547 Insulator end panel NIBE UKV 20 UKV 20 1000 A B 533 563 1063 1583 115 743 1058 1248 1428 1828 2078 593 21 0 15 115 B A Model 856 852 mm UKV 20 500 100...

Страница 15: ...r UKV 20 1000 UKV 20 750 UKV 20 500 Model C Energy efficiency class 140 123 98 W Heat loss 992 741 496 l Volume Accessories Not all accessories are available on all markets Immersion heater IU Immersi...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ...one industrielle RD 28 Rue du Pou du Ciel 01600 Reyrieux Tel 04 74 00 92 92 E mail info nibe fr www nibe fr FR NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way S419QG Chesterfield Tel 44 0 84...

Страница 20: ...WS name Gemensamt WS version a434 WS release date 2017 10 23 10 36 Publish date 2017 10 23 10 39 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 431416...

Отзывы: