System diagram
Explanation
Safety valve, solar
FL4
Pool system
CL11
Circulation pump, solar
GP4
Temperature sensor, pool
BT51
Pump station
GP30
VVM 310
EB15
Shut-off valve
QM43-45
Connection, Docking in high temp
XL18
Non-return valve
RM3-4
Connection, Docking out high temp
XL19
Miscellane-
ous
F2026/F2030/F2040
EB101
Expansion vessel, heating system
CM1
Solar kit
EP30
Safety valve, climate system
FL2
Unit box
AA25
Circulation pump for cooling pool
GP14
Temperature sensor, solar panel
BT53
Non-return valve
RM6
Expansion vessel
CM5
Designations according to standard IEC 61346-2.
Solar panel
EP8
Docking to solar installation
Solar heat is transferred to VVM 310. When the hot water demand is fulfilled the solar heat can be used, if there is
demand, to heat the building. It is possible to heat a pool when heating and hot water demands are satisfied.
Outline diagram
-FL2
-CM1
-EB15
-XL18
-XL19
-BT53
-EP8
-AA25
-CM5
-GP4
-GP4
-QM45
-RM3
-QM43
-QM44
T
P
-FL4
-RM4
T
-GP30
-EP30
-EP5
-RN10
-EB101
XL2
XL1
-HQ1
-QM1
-QM41
-FL10
-QM40
-EB101
Note! This is an outline diagram. Actual installations must be planned according to applicable standards.
11
GB
Содержание SCA 35
Страница 2: ......
Страница 36: ...36 Elschema Wiring diagram Elektrischer schalt plan Sähkökytkentäkaavio El diagram ...
Страница 37: ...37 ...
Страница 38: ...38 ...
Страница 39: ......