
Control with electrical supplement up to seven steps option 2
33
For the Installation engineer
FIGHTER 1310
Shunt should be set to 0 for this system.
19
Menu 19
Electricity: Additional heat can be controlled from
FIGHTER 1310 in 1, 2, 3 or 7 steps. Control is either
binary or linear and utilises 1, 2, or 3 relays in
FIGHTER 1310.
1 step: Relay 1 is used.
SH select in menu 14 is set to 3L.
2 step linear: The relays pick up in the order 1, 1+2.
Relay 1 and relay 2 are used.
SH select in menu 14 is set to 3L.
3 step linear: The relays pick up in the order 1, 1+2,
1+2+3. Relay 1, relay 2 and relay 3 are used. A strap
should be fitted between terminals 9 and 10.
SH select in menu 14 is set to 3L.
3 step binary: Relays 1 and 2 pick up in the order 1,
2, 1+2. In this mode FIGHTER 1310 controls 2 power
groups. Relay 1 is used for power group 1 and relay 2
is used for power group 2. Power group 2 should be
greater than 1.
SH select in menu 14 is set to 3.
7 step binary: Relays 1, 2 and 3 pick up in the order
1, 2, 1+2, 3, 3+1, 3+2, 3+2+1. In this mode FIGHTER
1310 controls 3 power groups. Relay 1 is use for
power group 1 and relay 2 is used for power group 2,
relay 3 is used for power group 3. Power group 2
should be greater than 1, and power group 3 should
be greater than 1+2. A strap should be fitted between
terminals 9 and 10. SH select in menu 14 is set to 7.
The electrical connection of the power groups is
made on terminals 11, 13 and 7 on terminal block (6).
Switching on and off
takes place as set out in the table in the chapter
Control (also applies with accessories), menu 18.
Controlling the additional heat,
electrical
Shunt
0
Loop
Relay 3
Relay 1
Relay 2
Содержание FIGHTER 1310
Страница 1: ...R INSTALLATION AND MAINTENANCE INSTRUCTIONS FIGHTER 1310 MOS GB 0349 1 611854 FIGHTER 1310 LEK...
Страница 2: ......
Страница 51: ......