![Nibe F2040 Series Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/nibe/f2040-series/f2040-series_installer-manual_1686261033.webp)
Start-up and inspection
1. The compressor heater (CH) must have been oper-
ational for at least 6 - 8 hours before the com-
pressor start can be initiated. This is done by
switching on the control voltage and disconnecting
the communication cable.
2. F2040 must be addressed if it is to have another
address than 1. See chapter Addressing via cascade
connection, on page 29.
3. The communication cable on the terminal block
AA23-X4 must not be connected.
4. Turn the isolator switch on.
5. Ensure that the F2040 is connected to the power
source.
6. After 6 – 8 hours the communication cable (W2) is
connected to terminal block AA23-X4.
7. Restart the indoor module. Follow the instructions
for "Start-up and inspection" in the installation
manual for the indoor module.
The heat pump starts 30 minutes after the outdoor
unit is powered and the communication cable (W2) is
connected, if necessary.
If scheduled
silent operation
is required, it must be
scheduled in the inner section or control module.
Caution
Silent mode should only be scheduled period-
ically because the maximum output is limited
to approx. the nominal values.
Caution
Do not start any electrical work until at least
two minutes after cutting the power.
F2040-8
LEK
AA23
AA23-X4
AA23-S3
31
Chapter 6 |
Commissioning and adjusting
NIBE™ F2040
Содержание F2040 Series
Страница 1: ...Installer manual LEK LEK LEK NIBE F2040 8 12 16 kW Air water heat pump IHB GB 1512 3 231844...
Страница 2: ......
Страница 55: ...Electrical circuit diagram F2040 8 53 Chapter 11 Technical data NIBE F2040...
Страница 57: ...F2040 12 55 Chapter 11 Technical data NIBE F2040...
Страница 59: ...F2040 16 57 Chapter 11 Technical data NIBE F2040...
Страница 62: ......
Страница 63: ......
Страница 64: ...231844 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu...