
Pipe installation
The pipe installation must be carried out in accordance
with applicable standards.
Circulation pump
A circulation pump must be used to ensure the
IJRZ
over
the immersion heater. If the heating system valves can
close the circulation completely, the bypass valve must be
installed so that the
IJRZ
through the electric heater does
not stop. In closed installations an approved safety valve
and pressure expansion vessel must be used.
NOTE
The pipe work must be
IJXVKHG
before the electric
heater is
FRQQHFWHG
so that any contaminants
GR
not
GDPDJH
the component parts.
Pressure drop diagram ELK 5/8
l/h
kPa
2,0
1,5
1,0
0,5
0
0
500
1000
1500
2000
Flow
7
ELK
ELK 8
For the Installer
Pipe installation
Содержание ELK 5
Страница 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS MOS GB 1435 4 ELK 5 ELK 8 031228 ELK 5 ELK 8 230V L E K...
Страница 2: ......
Страница 13: ...ELK 8 Wiring Diagram 1x230VAC 8kW ELK 8 503385 11 ELK 5 ELK 8 Miscellaneous Electrical circuit diagram...
Страница 17: ......
Страница 18: ......
Страница 19: ......