Screw facing panels onto the heat pump…
place lower facing panels diagonally into the frame,
close at top and fasten with in quick-release
screws…
The unit is now closed.
Rinsing, filling and bleeding
the system
attentIon
The system must be absolutely free from air be-
fore commissioning.
Guide control and sensor wires inside the unit
through the provided cable duct to the water con-
nection side…
1 cable duct for control
and sensor wires
Guide control and sensor wires out of the unit…
notICe.:
In order to enable unhinging of the electric
switch cabinet in the event that customer ser-
vice is necessary, the control and sensor wires
in the heat pump must have an excess length of
about 15 cm
.
notICe
.:
Electric heating element is connected for 6 kW
(9 kW) at factory. It can be connected for 2(3)
or 4 kW (6 kW) on the contactor q5 (q6).
for further information, see the adhesive label
on the electric heating element.
Install control and sensor wires in a conduit as far
as where they enter the building and from there on
to the heating and heat pump regulator…
connect control and sensor wires to the heating
and heat pump regulator according to the terminal
connection diagram and the circuit diagrams for the
respective model…
“Terminal diagrams” and “circuit diagrams” for
the respective model.
operating manual of the heating and heat pump
regulator.
Seal empty pipes on unit side…