
Checklist: Checks before commissioning
Checked
Notes
Refrigerant system
Pipe length
Height difference
Pressurization test
Leak testing
End pressure vacuum
Pipe insulation
Checked
Notes
Electrical installation
Property's main fuse
Group fuse
Load monitor / current sensor (Connects
to indoor module / control module.)
KVR 10
When installing AMS 10-6 / HBS 05-6,
check that the software version of the in-
door module/control module is at least
v8320.
Checked
Notes
Cooling
Pipe system, condensation insulation
7
Chapter 1 |
Important information
AMS 10
Содержание AMS 10-12
Страница 2: ......
Страница 12: ...Removing the covers AMS 10 6 LEK LEK LEK AMS 10 8 LEK LEK AMS 10 12 AMS 10 Chapter 2 Delivery and handling 12 ...
Страница 13: ...LEK LEK AMS 10 16 13 Chapter 2 Delivery and handling AMS 10 ...
Страница 28: ...LEK Incoming supply LEK LEK Cable gland AMS 10 Chapter 5 Electrical connections 28 ...
Страница 58: ...AMS 10 16 POWER SOURCE 1 230V 230V 50Hz AMS 10 Chapter 11 Technical data 58 ...
Страница 61: ......
Страница 62: ......