![NI Climbing Frames Trail011 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/ni-climbing-frames/trail011/trail011_instruction-manual_1685738009.webp)
Step 4:
•
Lift the assembly into the holes that have been dug, it should now be able to stand on its
own, especially if it has been braced.
Step 5:
•
Secure the 1.5m drop ropes through the hole predrilled in the 2.4m post. If this hasn’t been
done, then you will need to drill 3 x 32mm holes approx. 20mm deep on the top support
where the tyres are to be placed (there should be approx. 600mm between the holes). You
should then drill a 12mm hole in the centre of the 32mm holes through the whole post.