Step 6:
•
Lift the remaining 3m post and place it in the hole that has been dug for it. Secure the 2.4m
post to the two 3m uprights just below the 3m horizontal post Use the 2.4
m x 3” x 1.5” as
bracing if needed
. Again, you may need to predrill the holes if this hasn’t al
ready been done.